Tender Details
Particulars | Details |
---|---|
Title |
Mtc. Of Sonamura Taxapara Road Via Shibnagar (L 14.00 Km) (Ch.0.00 Km To 8.00 Km, L 8.00 Km) Under The Jurisdiction Of Sonamura Sub Division, Pwd (Rb) During The Year 2023 24
|
Description |
Grouting, Patch Soling, Patch Wbm, Carpeting With Seal Coat And Other Allied Works.
|
Organisation | Government of Tripura |
Tender Id | 2023_CEPWD_41947_1 |
Reference Number |
DNIT No. 32/EE/SNM/PWD/2023-24 |
Tender Fee | 1000 |
EMD | 47690 |
Tender Value | |
Place | O/o the EE, Sonamura Division, PWD(RandB) |
Link | https://tripuratenders.gov.in |
Start Date | September 14, 2023 00:00 |
End Date |
26/09/2023 ( Expired 625 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreDalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Read moreNagor re- alignment stretch from km. 415.900 to km. 418.300 surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Nagor re- alignment stretch from km. 415.900 to km. 418.300 surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Read moreMtc of approach road of boxcell culvert at mohanpur during the year 2025-26 under kamalpur pwd(rnb), kamalpur sub-division
Mtc of approach road of boxcell culvert at mohanpur during the year 2025-26 under kamalpur pwd(rnb), kamalpur sub-division
Read moreImprovement of road from gokulnagar panchayet office to nh 208 under kumarghat rd block l 1 550 km under pwd r and b division kumarghat sh widening gsb wbm 2 wbm 3 carpeting road side drain cd including protection work etc fatikroy assembly
Improvement of road from gokulnagar panchayet office to nh 208 under kumarghat rd block l 1 550 km under pwd r and b division kumarghat sh widening gsb wbm 2 wbm 3 carpeting road side drain cd including protection work etc fatikroy assembly
Read moreAAAAAAAAAA
Login to viewPatch repairing work of amtala - kalyanpur road from 0.00 kmp. to 4.90 km. under murshidabad highway division no.i during the year 2025-2026.
Read moreIrqp work of jamtara to nirsa via birgram road from (ch. 15300m to 24000m) total length- 8.70 km for the year 2025-26
Irqp work of jamtara to nirsa via birgram road from (ch. 15300m to 24000m) total length- 8.70 km for the year 2025-26
Read moreUpgradation of muktsar-abohar road via panniwala (mktodr-32) rd 0.00-19.20, 28.00-37.70 equal to 28.90 km including maintenance of road for 3 year (1 year defect liability period plus 2 year maintenance period)
Upgradation of muktsar-abohar road via panniwala (mktodr-32) rd 0.00-19.20, 28.00-37.70 equal to 28.90 km including maintenance of road for 3 year (1 year defect liability period plus 2 year maintenance period)
Read moreWidening strengthening of g.t. road to bara pind dhuleta masani upto phagwara dosanjh mukandpur banga phillaur road km 0.00 to 16.10km 16.10 km jodr09 under 5054 rb10 pci 2 including maintenance of road for 5 years 1 year defect liability period 4 yr
Widening strengthening of g.t. road to bara pind dhuleta masani upto phagwara dosanjh mukandpur banga phillaur road km 0.00 to 16.10km 16.10 km jodr09 under 5054 rb10 pci 2 including maintenance of road for 5 years 1 year defect liability period 4 yr
Read moreShifting of utility line of dws passing along the proposed road from shyamali bazar sainik board to g.b trauma centre left side
Estimate for shifting of utility under dws sub division no iii kunjaban agartala of dws department for road widening by pwd from shyamali bazar sainik board to gb trauma centre during the year 2024 25
Read moreof your Industry type