Tender Details

Particulars Details
Title
Construction Of Infrastructure And Development Work At New Itbp Camp Situated In Lapthal Valley Approx Height 14694 Ft And Approx 126 Km From Joshimath Distt Chamoli Uttrakand
Description
Construction Of Infrastructure And Development Work At New Itbp Camp Situated In Lapthal Valley Approx Height 14694 Ft And Approx 126 Km From Joshimath Distt Chamoli Uttrakand
Organisation DG, Indo-Tibetan Border Police Force | Central Govt. Ministry/Department
Tender Id 2024_ITBP_816346_1
Reference
Number
No/ITBP/SHQ(DDN)/ENGR/24-329
Tender Fee 0
EMD 35 Lakh
Tender Value
Place Construction of infrastructure and development wor
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=857969
Start Date July 13, 2024 00:00
End Date

12/08/2024 ( Expired 251 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Preparation of detailed project report, pre construction activity and supervision for the work of elevated flyover in dhanbad town from km-53(dhansar) on (nh-218) to govindpur on nh-19 (old nh-2) in the state of jharkhand

Preparation of detailed project report, pre construction activity and supervision for the work of elevated flyover in dhanbad town from km-53(dhansar) on (nh-218) to govindpur on nh-19 (old nh-2) in the state of jharkhand

Read more
Construction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police

Construction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police

Read more
Construction of infrastructure and development work lgsf (light gauge steel framed) building at new itbp camp dobala situated in lapthal valley approx. height 14694 ft and approx. 126 km from 1st bn joshimath, distt chamoli (ukd) connected by metaled

Construction of infrastructure and development work lgsf (light gauge steel framed) building at new itbp camp dobala situated in lapthal valley approx. height 14694 ft and approx. 126 km from 1st bn joshimath, distt chamoli (ukd) connected by metaled

Read more
Const of drainage system from campus to existing canal of state govt bihar near village and beautification of existing nalah at 48th bn katihar and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar bihar

Const of drainage system from campus to existing canal of state govt bihar , near village and beautification of existing nalah at 48th bn katihar and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar bihar

Read more
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode

Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode

Read more
Construction work of c.c. road m-30, m-20 and curbed drain at various places in uday nagar basti no.1 basti 2 basti 3 and new shobhapur and old gokalpur area under gokalpur ward. (any mad)

Construction work of c.c. road m-30, m-20 and curbed drain at various places in uday nagar basti no.1 basti 2 basti 3 and new shobhapur and old gokalpur area under gokalpur ward. (any mad)

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise