Tender Details
Particulars | Details |
---|---|
Title |
Tn 5347 Mechanical Maintenance Of Heavy Equipments Including Wagon Tipplers, Rotary Breaker, Crushers And Stacker Reclaimers In Chp Plant Of Kstps, Kota
|
Description |
Mechanical Maintenance Of Heavy Equipments Including Wagon Tipplers, Rotary Breaker, Crushers And Stacker Reclaimers In Chp Plant Of Kstps, Kota
|
Organisation | RRVUN - CMD | State Govt. and UT |
Tender Id | 2024_RRVUN_432067_1 |
Reference Number |
TN-5347 |
Tender Fee | 2680 |
EMD | 1.97 Lakh |
Tender Value | |
Place | Kota Super Thermal Power Station |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=776589 |
Start Date | November 28, 2024 17:30 |
End Date |
10/12/2024 ( Expired 132 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Tn-11166 supply of m/s dcips make spares for clinker grinder, jet pump and feed gate for bottom ash hopper and wetting head system for wet ash disposal from esp hoppers unit 5 ash handing plant of kstps, kota.
Supply of m/s dcips make spares for clinker grinder, jet pump and feed gate for bottom ash hopper and wetting head system for wet ash disposal from esp hoppers unit 5 ash handing plant of kstps, kota.
Read moreTn-5383 capital and routine maintenance of boiler pressure part area (hp/lp welding of boiler/turbine area, hp/lp valves, soot blowers and its 11associated works) of unit 1 to 7 kstps, kota
Capital and routine maintenance of boiler pressure part area (hp/lp welding of boiler/turbine area, hp/lp valves, soot blowers and its 11associated works) of unit 1 to 7 kstps, kota
Read moreThe work of shift wise routine checking and mechanical maintenance of auxiliaries of coal handling plant and fire quenching in coal yard a/btps, obra
The work of shift wise routine checking and mechanical maintenance of auxiliaries of coal handling plant and fire quenching in coal yard a/btps, obra
Read moreAnnual contract for operation, cleaning and assistance in prive maintenance of elevators(lifts) including csctpp residential multistory r3 and r4 (except chp) installed at csctpp, rvunl, chhabra tn-sc-w-87/2024-25(elect)
Annual contract for operation, cleaning and assistance in prive maintenance of elevators(lifts) including csctpp residential multistory r3 and r4 (except chp) installed at csctpp, rvunl, chhabra
Read moreSupply of spares for hydraulic power packs installed in wagon tipplers and side arm chargers of chp at katpp rvunl jhalawar
Supply of spares for hydraulic power packs installed in wagon tipplers and side arm chargers of chp at katpp, rvunl, jhalawar.
Read moreTn-19063 supply, installation, testing and commissioning (etc) of control desk, vfd panel along with motors for travel, local control station (lcs), junction box, and 6.6 kv ht panel with vcb for stacker reclaimer no.1 at kstps, kota.
Supply, installation, testing and commissioning (etc) of control desk, vfd panel along with motors for travel, local control station (lcs), junction box, and 6.6 kv ht panel with vcb for stacker reclaimer no.1 at kstps, kota.
Read moreTn-5381 repair and maintenance of roads and road berms at kstps plant, kota.
Repair and maintenance of roads and road berms at kstps plant, kota.
Read moreTn-5386 work of supply, fixing and repair of thermo plastic ppg (polypropylene glass) flooring and lining work at dm plant stage-i and ii area at kstps, rvun, kota.
Work of supply, fixing and repair of thermo plastic ppg (polypropylene glass) flooring and lining work at dm plant stage-i and ii area at kstps, rvun, kota.
Read moreTn-5384 routine and breakdown maintenance of fire fighting system of kstps, kota
Routine and breakdown maintenance of fire fighting system of kstps, kota
Read moreProviding assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.0
Providing assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.
Read moreof your Industry type