Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 2 No. Piezometers 44m And 284m Depth With Aquifer Performance Test At Sasti Expansion Ocm Under Sasti Sub Area 2nd Call
|
Description |
Construction Of 2 No. Piezometers 44m And 284m Depth With Aquifer Performance Test At Sasti Expansion Ocm Under Sasti Sub Area 2nd Call
|
Organisation | Western Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_WCL_304538_1 |
Reference Number |
wcl-ba3650-civ-e164-23-24/933 |
Tender Fee | 0 |
EMD | 26000 |
Tender Value | |
Place | WCL Ballarpur Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=315504 |
Start Date | March 11, 2024 20:30 |
End Date |
21/03/2024 ( Expired 422 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Read moreQuality improvement of drinking water supply by way of construction of 8 nos. 5000 gph capacity package type iron removal plant (irp) and 03 nos. pump house at different places under the jurisdiction of dws sub-division, salema.
Quality improvement of drinking water supply by way of construction of 8 nos. 5000 gph capacity package type iron removal plant (irp) and 03 nos. pump house at different places under the jurisdiction of dws sub-division, salema.
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreConstruction of additional foundations for 2 no 66kv line bay at 66kv s/s naugajja and 1 no 66kv line bay at 66kv s/s mustfapur
Construction of additional foundations for 2 no 66kv line bay at 66kv s/s naugajja and 1 no 66kv line bay at 66kv s/s mustfapur (under op. circle kapurthala) (twl no. 60/nz/2023-24/annex-b)
Read moreChambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25
Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm
Read moreSub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(3rd call)
Sub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(3rd call)
Read moreConstruction of revetment of tower no 37 of 132 kv jwalapur-roorkee line associated with 220 kv sub-station sidcul haridwar under 220 kv o and m division sidcul haridwar
Construction of revetment of tower no 37 of 132 kv jwalapur-roorkee line associated with 220 kv sub-station sidcul haridwar under 220 kv o and m division sidcul haridwar
Read moreConstruction of revetment of tower no. 13 of 132 kv sidcul-jwalapur line cktii associated with 220 kv sub-station sidcul haridwar under 220 kv o and m division sidcul haridwar
Construction of revetment of tower no. 13 of 132 kv sidcul-jwalapur line cktii associated with 220 kv sub-station sidcul haridwar under 220 kv o and m division sidcul haridwar
Read moreConstruction of rcc elevated over head reservoir (intze type) of capacity 600 cum at zone- 7, ward -4 with house service connection at zone 1 and 2 and jack pushing under sh of zone-7 within buniadpur municipality under proposed water supply scheme o
Construction of rcc elevated over head reservoir (intze type) of capacity 600 cum at zone- 7, ward -4 with house service connection at zone 1 and 2 and jack pushing under sh of zone-7 within buniadpur municipality under proposed water supply scheme o
Read moreof your Industry type