Tender Details

Particulars Details
Title
Underground Pipeline Works
Description
Earthwork For Excavation Of Trenches For Laying Of Underground Pipeline, Lowering And Jointing Of Various Diameter Rcc Pipes, Fixing Of Air Vent Pipes, Risers And Civil Work Etc.
Organisation Department of Agriculture | State Govt. and UT
Tender Id 2024_DOA_119725_1
Reference
Number
DSWC/DSCO/BTI/2023-24/02
Tender Fee 2715
EMD 37545
Tender Value -
Place Bathinda
Link
View Original Tender Notice

https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=244669

Start Date March 07, 2024 20:30
End Date
Expired 15/03/2024

Expired 926 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities

Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities

Read more
Design, manufacture, supply, transportation, erection, testing and commissioning of 60 kl vertical milk storage silo vmst with associated accessories and allied works on turnkey basis at bemul dairy

Design, manufacture, supply, transportation, erection, testing and commissioning of 60 kl vertical milk storage silo vmst with associated accessories and allied works on turnkey basis at bemul dairy

Read more
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.

Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis

Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.

Read more
Rcc underground pipeline laying works

Laying and jointing of rcc underground pipeline work, fixing of arv, aav, gv and construction of haus and all other allied works

Read more
Rcc underground pipeline laying works

Laying and jointing of rcc ugpl, fixing of arv, aav, gv/sluice valve and construction of haus and all other allied works.

Read more
Rcc underground pipeline laying works

Laying and jointing of rcc ugpl, fixing of arv, aav, gv/sluice valves, construction of haus and all other allied works

Read more
Rcc underground pipeline laying works

Laying and jointing of rcc ugpl, fixing of arv, aav, gv/sluice valve and construction of haus and all other allied works

Read more
Rcc underground pipeline laying works

Laying and jointing of rcc ugpl, fixing of aav, arv, gv/sluice valve and construction of haus and all other allied works

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise