Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Four Leg For Deionization System 🚧 The Ministry Of Railways, Under The Central Government, Invites Tenders For The Supply Of Four Leg For Its Deionization System At Mumbai. 🛠️ 📅 Submission Deadline: May 09, 2024, 11:00 Am Tender Fee: Inr 0 Emd: Inr 0 Interested Vendors Must Submit Detailed Bids, Including Technical Specifications, Pricing, And Compliance With Safety And Quality Standards. This Is A Significant Opportunity For Vendors To Contribute To The Infrastructure Of India's Railways. Keywords: Ministry Of Railways, Deionization System, Four Leg, Central Government, Tender, Infrastructure, Railways Procurement| Particulars | Details |
|---|---|
| Title |
Four Leg
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106334403 |
|
Reference Number |
61245661 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | |
| Place | Mumbai |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/052024/106334403/viewNitPdf_4557462.pdf |
| Start Date | May 02, 2024 19:08 |
| End Date |
Expired
09/05/2024
Expired 784 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Read moreFour laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement
Four laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement
Read moreEngagement of user fee agency through e-tender at mohana toll plaza at km 58.035 for the project four laning of gohana-sonepat section of nh-352a (pkg-ii) from km 40.601 to km 78.837 (length 38.236 km) in the state of haryana
Engagement of user fee agency through e-tender at mohana toll plaza at km 58.035 for the project four laning of gohana-sonepat section of nh-352a (pkg-ii) from km 40.601 to km 78.837 (length 38.236 km) in the state of haryana
Read moreof your Industry type