Tender Details
Particulars | Details |
---|---|
Title |
Inverter Module To Medha Part No. Sp628 V2201007 Make Medha For Igbt Based 3 Phase Drive Propulsion Equipment For Wag 9 Loco.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 106548600 |
Reference Number |
93245199A |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Bhubaneswar |
Link | https://www.ireps.gov.in/ireps/supply/pdfdocs/122024/106548600/viewNitPdf_4799970.pdf |
Start Date | December 09, 2024 21:26 |
End Date |
13/12/2024 ( Expired 152 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Drive shaft, part no 4 for model 76ac make m s.kay international pvt.ltd,mc.sl.no.14081155tbp,drive
Read more
C82040000497 part a for supply item supply of 1 no 500 kva 3 phase dg set along with accessories re
Read more
Seal valve stem part no 3943888 or 5253590 for engine assy, model-qsl-9, make-cummins suitable for
Read more
Sc050660116 nordlock washer diff wear ring for 3 point 3kv 700kw hayward tyler make bcp part no 425
Read more
29163547 - overhauling kit for dead engine of ercp for kbil make electric ccb system of 3 phase locomotives
For complete deion and other details, please refer to tender
Read moreSet of gasket for sanding arrangement of wag-9 loco
For complete deion and other details, please refer to tender
Read moreMicroprocessor based controller for kirloskar make kes-11 compressor part no. 672111222150. pre loa
Read more
Sc050660116 nordlock washer diff wear ring for 3 point 3kv 700kw hayward tyler make bcp part no 425
Read more
(1) supply of smart rtu prototype systems for phase-i, qty: 3 no s and (2) supply of smart rtu production systems for phase-ii, qty: 3 no s. scope of work & technical details as mentioned in annexure t1 to ecil-hyderabad.
(1) supply of smart rtu prototype systems for phase-i, qty: 3 no s and (2) supply of smart rtu production systems for phase-ii, qty: 3 no s. scope of work & technical details as mentioned in annexure t1 to ecil-hyderabad.
Read moreConstruction of additional 132 kv s/c line (3 phase and 1 spare) of 1.65 km route length with 400 mm2, xlpe cable from existing laid cable (400 mm2, xlpe cable ) to termination tower location no. 08 along with jointing of cables for completing the l
Construction of additional 132 kv s/c line (3 phase and 1 spare) of 1.65 km route length with 400 mm2, xlpe cable from existing laid cable (400 mm2, xlpe cable ) to termination tower location no. 08 along with jointing of cables for completing the l
Read moreof your Industry type