Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Amli Kakar To Vaniya Panwa Via Negadfala Shamshan Ghat 2.50 Km. Gravel Road With Cd Work Under Mgnregs
|
| Description |
Gravel Road With Cd Work Under Mgnregs
|
| Organisation | Government of Rajasthan |
| Tender Id | 2023_CEPWD_353410_9 |
|
Reference Number |
NIT12 |
| Tender Fee | 500 |
| EMD | 28000 |
| Tender Value | |
| Place | Executive Engineer PWD Dn. Salumber |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in |
| Start Date | July 26, 2023 19:30 |
| End Date |
Expired
02/08/2023
Expired 1040 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Gravel sadak with puliya nirma n work mukhiya marg to samsh an ghat tak chanawala ps sajja ngarh (zbn2627wsob00190)
Gravel sadak with puliya nirma n work mukhiya marg to samsh an ghat tak chanawala ps sajja ngarh (zbn2627wsob00190)
Read moreProvision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Provision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Read moreRehabilitation and strengthening of a road from chokpot to kharukol via warima, kenegre, paromgre, nokatgre, meghalaya length 46.080 km under nesids roads
Rehabilitation and strengthening of a road from chokpot to kharukol via warima, kenegre, paromgre, nokatgre, meghalaya length 46.080 km under nesids roads.
Read moreRemaining work on sh-21a to palri kallan via bikharniya kallan road km 9/350 to to 9/710 (bikharniya khurd) and 13/615 to 13/940 (chhabasar) including approach roads
Remaining work on sh-21a to palri kallan via bikharniya kallan road km 9/350 to to 9/710 (bikharniya khurd) and 13/615 to 13/940 (chhabasar) including approach roads
Read moreOne time improvement work of shahdol city portion to 2 lane with paved shoulders between existing km 132/500 (design km 0/00) to km 141/300 (design km 8.80) (length 8.80 km) on katni shahdol road section of nh-43 in the state of madhya pradesh.
One time improvement work of shahdol city portion to 2 lane with paved shoulders between existing km 132/500 (design km 0/00) to km 141/300 (design km 8.80) (length 8.80 km) on katni shahdol road section of nh-43 in the state of madhya pradesh.
Read moreImp of road frm d.k. rd to k.k. rd via zela parisad office l 1.95 km portion from 0.00 to 1.70 km under part-xi impl. of sna sparsh mode) of the sh gsb, wbm 2,wbm 3, seal coating, rd side drain, road signage etc. comp. job no.tpcom183 2025 26
Imp of road frm d.k. rd to k.k. rd via zela parisad office l 1.95 km portion from 0.00 to 1.70 km under part-xi impl. of sna sparsh mode) of the sh gsb, wbm 2,wbm 3, seal coating, rd side drain, road signage etc. comp. job no.tpcom183 2025 26
Read moreRejinagar - sarbangapur road from chainage 0.00 kmp. to 0.50 km. and 5.50 km. to 8.00 kmp. (in stretches) repairing work under murshidabad highway division no.i. in the district of murshidabad during 2026-27
Rejinagar - sarbangapur road from chainage 0.00 kmp. to 0.50 km. and 5.50 km. to 8.00 kmp. (in stretches) repairing work under murshidabad highway division no.i. in the district of murshidabad during 2026-27
Read moreRoad improvement work by hotmix plant from bhadoria petrol pump to new speed coaching square via new light coaching in mohalla rani ganj under zone 06 ward 30 ambedkar nagar.
Road improvement work by hotmix plant from bhadoria petrol pump to new speed coaching square via new light coaching in mohalla rani ganj under zone 06 ward 30 ambedkar nagar.
Read moreWbpw(roads)/ sr. se / nhc /nit-01 (2nd call) /2026-2027/02
Aminpur battala more to dehaband road via katason, sarala from 0.00 km to 10.00 km, surfacing work under dakshin dinajpur highway division, in the district of dakshin dinajpur project id pd252648191s000. (2nd call).
Read moreConstruction of 120m length pedestrian bridge to connect malana village with km 06 of arakot chinwa balcha motor road under vikaskhand mori in district uttarkashi
Construction of 120m length pedestrian bridge to connect malana village with km 06 of arakot chinwa balcha motor road under vikaskhand mori in district uttarkashi
Read moreof your Industry type