Tender Details
Particulars | Details |
---|---|
Title |
Fabrication And Installation Of Pneumatic Passenger Door Assembly With The Spare Parts Required In Salem And Dharmapuri Region Moffussil And Town Buses
|
Description |
Fabrication And Installation Of Pneumatic Passenger Door Assembly With The Spare Parts Required In Salem And Dharmapuri Region Moffussil And Town Buses
|
Organisation | Tamilnadu State Transport Corporation | State Govt. and UT |
Tender Id | 2024_TNSTC_508283_1 |
Reference Number |
TNSTC/83/PUR/2024 |
Tender Fee | 0 |
EMD | 5000 |
Tender Value | |
Place | Salem / Dharmapuri |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=604601 |
Start Date | December 06, 2024 22:40 |
End Date |
13/12/2024 ( Expired 159 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreHiring of services for design fabrication installation of agitators
Hiring of services for design fabrication installation and commissioning of agitators in 02 tanks of wors of well services assam asset
Read moreSupply, installation, testing and commissioning of 20 passenger bed lift and 01 no. service lift along with allied works such as earthing, shaft, lighting, resizing of shaft and other related works
Supply, installation, testing and commissioning of 20 passenger bed lift and 01 no. service lift along with allied works such as earthing, shaft, lighting, resizing of shaft and other related works
Read moreSupply, installation, testing and commissioning of packaged water treatment plants with ancillary works for various rpws scheme under daringibadi block in kandhamal district
Supply, installation, testing and commissioning of packaged water treatment plants with ancillary works for various rpws scheme under daringibadi block in kandhamal district
Read moreSupply, installation, testing and commissioning (sitc) of treated fresh air system for lecture halls connected with vrf air-conditioning system in apj abdul kalam block (lhc-ii) at iit roorkee
Supply, installation, testing and commissioning (sitc) of treated fresh air system for lecture halls connected with vrf air-conditioning system in apj
 abdul kalam block (lhc-ii) at iit roorkee
Read moreFabrication, assembling and installation of inert gas atomization based powder production equipment in dept. of mechanical engg., iit (bhu) varanasi.
Fabrication, assembling and installation of inert gas atomization based powder production equipment in dept. of mechanical engg., iit (bhu) varanasi.
Read moreDesign, support, supply, installation and commissioning, training, warranty and amc of medical cyclotron with turnkey
Design, support, supply, installation and commissioning, training, warranty and amc of medical cyclotron with turnkey (complete scope as per the attached document in specification)
Read moreSupply fabrication testing and installation of nrvs in tld at farrukhabad bp
Supply, fabrication, testing and installation of nrvs in
 unloading lpg liquid line and vapour line at lpg bp farrukhabad
Read moreCarrying out mechanical works in connection with fabrication, erection, testing and commissioning of petroleum product and fire hydrant piping, supply installation, testing and commissioning of mechanized oil water separator, along with allied works
Carrying out mechanical works in connection with fabrication, erection, testing and commissioning of petroleum product and fire hydrant piping, supply installation, testing and commissioning of mechanized oil water separator, along with allied works
Read moreE.l.d.c no/s.m.ii /p1/1708/ 2025 supply and installation of 4 nos of 13 person lifts for 4 nos of uphcs in zone 1 and 4 with comprehensive annual maintenance contract for a period of 5 years after one year warranty period
Supply and installation of 4 nos of 13 person lifts for 4 nos of uphcs in zone 1 and 4 with comprehensive annual maintenance contract for a period of 5 years after one year warranty period
Read moreof your Industry type