Tender Details

Particulars Details
Title
Supply And Installation Of Mobile Workstation With M1/M2 Processor For New Generation Innovation Network (Ngin), Tripura University
Description
Supply And Installation Of Mobile Workstation With M1/M2 Processor For New Generation Innovation Network (Ngin), Tripura University
Organisation Central Public Procurement Portal 1
Tender Id 2023_TU_772648_1
Reference
Number
No.F.TU/IT/NGIN/2022/01
Tender Fee 500
EMD 3000
Tender Value -
Place TRIPURA UNIVERSITY SURYAMANINAGAR
Link
View Original Tender Notice

https://eprocure.gov.in

Start Date September 21, 2023 23:30
End Date
Expired 09/10/2023

Expired 1047 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply & installation of mono production series printer and other related items for university campus.

Supply & installation of mono production series printer and other related items for university campus.

Read more
Selection of network system integrator (nsi)supply installation maintenance of network equipment to connect all branches offices and manage and monitor the banks network under opex model

Selection of network system integrator (nsi)supply installation maintenance of network equipment to connect all branches offices and manage and monitor the banks network under opex model

Read more
Design, fabrication, supply, installation & commissioning of a museum-grade animated display prototype depicting the journey of electricity from power generation to end consumers through the bihar transmission & distribution network.

Design, fabrication, supply, installation & commissioning of a museum-grade animated display prototype depicting the journey of electricity from power generation to end consumers through the bihar transmission & distribution network.

Read more
Rate contract for supply, installation, testing & commissioning (sitc) of 1.0 ton, 1.5 ton & 2.0 ton energy efficient inverter split air conditioners with compatible voltage stabilizers, standard installation accessories and electrical connections for aryabhatta knowledge university (aku), patna.

Rate contract for supply, installation, testing & commissioning (sitc) of 1.0 ton, 1.5 ton & 2.0 ton energy efficient inverter split air conditioners with compatible voltage stabilizers, standard installation accessories and electrical connections for aryabhatta knowledge university (aku), patna.

Read more
Selection of agency for supply and installation of single bed, including mattress, bedsheet, pillow and duvet with cover at bipard, gaya

Selection of agency for supply and installation of single bed, including mattress, bedsheet, pillow and duvet with cover at bipard, gaya

Read more
For supply, installation and commissioning of campus networking system for the department of it cell.

For supply, installation and commissioning of campus networking system for the department of it cell.

Read more
Creation of 63 kva sub stations along with ht lt network at new colony alamgunj and challa mohalla bonpora d.k.pora under ut capex 2026

Creation of 63 kva sub stations along with ht lt network at new colony alamgunj and challa mohalla bonpora d.k.pora under ut capex 2026

Read more
Providing and installation of hi-tech polycarbonate house, natural ventilation polyhouse and shade net house for tissue-culture lab at acharya narendra dev university of agriculture and technology kumarganj, ayodhya

Providing and installation of hi-tech polycarbonate house, natural ventilation polyhouse and shade net house for tissue-culture lab at acharya narendra dev university of agriculture and technology kumarganj, ayodhya

Read more
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Read more
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise