Tender Details

Particulars Details
Title
Raising And Maintenance Of 2025 Teak Plantation Karayalarmeth In Kadamanpara Forest Station Under Aryankavu Range During 2025 26 To 2028 29
Description
Raising And Maintenance Of 2025 Teak Plantation Karayalarmeth In Kadamanpara Forest Station Under Aryankavu Range During 2025 26 To 2028 29
Organisation Forest Department | State Govt. and UT
Tender Id 2025_FD_765330_1
Reference
Number
A2-25903/25
Tender Fee 2950
EMD 50000
Tender Value
Place ARYANKAVU RANGE
Link https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1250304
Start Date May 29, 2025 23:30
End Date

06/06/2025 ( Expired 5 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Read more
Supply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26

Supply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26

Read more
Supply, installation, commissioning and maintenance of parasail boat at dumbbor lake, tripura along with amc of 4 years during the year 2025-26.

Supply, installation, commissioning and maintenance of parasail boat at dumbbor lake, tripura along with amc of 4 years during the year 2025-26.

Read more
Supply, installation, commissioning and maintenance of frp made 10 seater yatch alongwith flybridge powerd with yamaha or suzuki or tohatsu or honda obm at dumboor lake, tripura alongwith amc during the year 2025-26

Supply, installation, commissioning and maintenance of frp made 10 seater yatch alongwith flybridge powerd with yamaha or suzuki or tohatsu or honda obm at dumboor lake, tripura alongwith amc during the year 2025-26

Read more
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Read more
Ca no.cwe bly/ge (e)/21 of 2025- 2026special repairs to otm bldg no t-102 and t-26 of 6 mtn div ord unit and otm bldg no t-90 t-96 or living and t-100 mi room of 883 bn asc under ge east bareilly

Ca no.cwe bly/ge (e)/21 of 2025- 2026special repairs to otm bldg no t-102 and t-26 of 6 mtn div ord unit and otm bldg no t-90 t-96 or living and t-100 mi room of 883 bn asc under ge east bareilly

Read more

Annual operations&amp#x0d and maintenance of&amp#x0d spring water based&amp#x0d pwss to accommodate&amp#x0d fhtc within&amp#x0d kalimpong district&amp#x0d under neorakhola&amp#x0d water supply and&amp#x0d maintenance division,&amp#x0d phe dte

Read more
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Read more
Cleaning of spilled iron ore in and around the loading line conveyors namely conv 403, conv 404, tripper 405, vibratory feeder 406/a to f, conv 407/a to f and conv 408/a to f of loading plant for a period of 10 months in fy 2025-26

Cleaning of spilled iron ore in and around the loading line conveyors namely conv 403, conv 404, tripper 405, vibratory feeder 406/a to f, conv 407/a to f and conv 408/a to f of loading plant for a period of 10 months in fy 2025-26

Read more
10 dyce ds circle ropar 2025 26

Providing gang for the work of attending to resolving the fuse off call complaints and lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds division under ds circle pspcl ropar on per day basis

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise