Tender Details

Particulars Details
Title
Drilling Of 250mm Non Coring Vertical Bore Hole Near Pit No. 3 To Establish Water Discharge Of R V (Satgram) Seam At J. K. Nagar (R) Colliery
Description
Drilling Of 250mm Non Coring Vertical Bore Hole Near Pit No. 3 To Establish Water Discharge Of R V (Satgram) Seam At J. K. Nagar (R) Colliery
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 7000
Tender Value
Place Satgram-Sripur
Link

AAAAAAAAAA

Login to view
Start Date June 28, 2025 22:30
End Date

08/07/2025 ( 9 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 14 nos. of sectionalisation stoppings to sectionalise rise side above shaft level of pit no. 2 upto the mine boundary in r-v (satgram) seam, j. k. nagar

Construction of 14 nos. of sectionalisation stoppings to sectionalise rise side above shaft level of pit no. 2 upto the mine boundary in r-v (satgram) seam, j. k. nagar&#x0d colliery&#x0d

Read more
Provision towards laying of 250mm dia di k-9 water supply rising main with connection to 900mm dia di feeder mains from sikharchandi with fixing of flow meter and flow control valves etc for loading of gsr at arya vihar in ward no-8 of bmc, bbsr

Provision towards laying of 250mm dia di k-9 water supply rising main with connection to 900mm dia di feeder mains from sikharchandi with fixing of flow meter and flow control valves etc for loading of gsr at arya vihar in ward no-8 of bmc, bbsr

Read more
Provision towards laying of 250mm dia di k-9 water supply rising main with fixing of flow meter and flow control valves etcs for loading to gsr at osap 7th bn dma in ward no.-12 of bmc, bhubaneswar

Provision towards laying of 250mm dia di k-9 water supply rising main with fixing of flow meter and flow control valves etcs for loading to gsr at osap 7th bn dma in ward no.-12 of bmc, bhubaneswar

Read more
Construction of vrcc sw drains culverts from d.no:39-9-103/3/1 to d.no: 39-9-105, d.no:39-9-126 to d.no:39-9-142/1/3 at tenneti nagar in ward no.50, zone v(a),gvmc.

Construction of vrcc sw drains culverts from d.no:39-9-103/3/1 to d.no: 39-9-105, d.no:39-9-126 to d.no:39-9-142/1/3 at tenneti nagar in ward no.50, zone v(a),gvmc.

Read more
Drilling of bore wells, pipelines, providing water connections to gardening, plantation and reconstructions of dismantled walls, relaying of pavers at sri venkateswara swamy temple venkatapalem (v), guntur (dt) amaravathi capital area of a.p

Drilling of bore wells, pipelines, providing water connections to gardening, plantation and reconstructions of dismantled walls, relaying of pavers at sri venkateswara swamy temple venkatapalem (v) ,guntur district, amaravathi, capital area of a.p

Read more
Construction of 5 nos. of 0.25m thick ventilation stoppings and for repairing of 2 nos. of ventilation stoppings for the proposed panel bsp7 at bogra (rvi) seam of pit no. 3, j. k. nagar colliery

Construction of 5 nos. of 0.25m thick ventilation stoppings and for repairing of 2 nos. of ventilation stoppings for the proposed panel bsp7 at bogra (rvi) seam of pit no. 3, j. k. nagar colliery

Read more
Sealing of 04 nos. of preparatory stoppings of bsp6 depillaring panel at r-vi (bogra) seam of j. k. nagar colliery

Sealing of 04 nos. of preparatory stoppings of bsp6 depillaring panel at r-vi (bogra) seam of j. k. nagar colliery

Read more
Construction of 7 nos.of isolation stoppings(02nos. full and 05 nos. preparatory stopping), for proposal panel w-x1(a) at no. 3 and 4 pit in nega rvlll seam under nimcha(r)colliery

Construction of 7 nos.of isolation stoppings(02nos. full and 05 nos. preparatory stopping), for proposal panel w-x1(a) at no. 3 and 4 pit in nega rvlll seam under nimcha(r)colliery

Read more
Drilling of 400mm non-coring vertical bore hole near pit no. 3 to establish stowing range upto r-v (satgram) seam at j. k. nagar colliery

Drilling of 400mm non-coring vertical bore hole near pit no. 3 to establish stowing range upto r-v (satgram) seam at j. k. nagar colliery

Read more
Drilling of 250mm non-coring vertical bore hole near pit no. 3 to establish water discharge of r-v (satgram) seam at j. k. nagar (r) colliery

Drilling of 250mm non-coring vertical bore hole near pit no. 3 to establish water discharge of r-v (satgram) seam at j. k. nagar (r) colliery

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise