Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Front Facia
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106367932 |
|
Reference Number |
01245261 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | SARAN |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/082024/106446498/viewNitPdf_4685603.pdf |
| Start Date | August 20, 2024 22:06 |
| End Date |
Expired
30/08/2024
Expired 775 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement of existing front facia signage at airside of the terminal building by illuminated led signage including improvement of other internal signages inside terminal building at lbsi airport varanasi
Replacement of existing front facia signage at airside of the terminal building by illuminated led signage including improvement of other internal signages inside terminal building at lbsi airport varanasi
Read moreRepairs to chajja, facia, and other structural rehabilitation works and connected items under ge (a) jaisalmer.
Repairs to chajja, facia, and other structural rehabilitation works and connected items under ge (a) jaisalmer.
Read more3.00x10 tubeless tyres for two wheelers front fitment,90/90-10 tubeless tyres for two wheelers front fitment
3.00x10 tubeless tyres for two wheelers front fitment,90/90-10 tubeless tyres for two wheelers front fitment
Read moreProfile shed in front of hanuman mandir
Profile shed in front of hanuman mandir mela parishar mela gwalior
Read moreIntegrated front end pcb v1,integrated front end pcb v2,integrated front end pcb v3,design and development nre charges,evaluation board of adin1100,evaluation board of adin6310 with 10 baset1l interface
Integrated front end pcb v1,integrated front end pcb v2,integrated front end pcb v3,design and development nre charges,evaluation board of adin1100,evaluation board of adin6310 with 10 baset1l interface
Read moreFront rh shocks absorber with spring,wiper blade front,wiper blade rear,fog lump bulb rh,fog lump bulb lh
Front rh shocks absorber with spring,wiper blade front,wiper blade rear,fog lump bulb rh,fog lump bulb lh
Read moreLeakage/seepage, roof treatment, roof sheet, facia plaster, chajja etc. misc work in wnc (o) mess, imsc and other building under age b/r-i under ge (nw) nofra.
Leakage/seepage, roof treatment, roof sheet, facia plaster, chajja etc. misc work in wnc (o) mess, imsc and other building under age b/r-i under ge (nw) nofra.
Read moreProcurement of front end wheel loader having 5t capacity
Procurement of front end wheel loader having 5t capacity
Read moreof your Industry type