Tender Details

Particulars Details
Title
Selection Of System Integrator (Si) For Implementation, Design, Development, Upgradation Of Sap Ecc
Description
Selection Of System Integrator (Si) For Implementation, Design, Development, Upgradation Of Sap Ecc&Amp#X0d 6.0 To Rise With Sap S/4 Hana And Ams (Application Management Services) For Four (04) Years
Organisation Co-operation, Marketing and Textiles Dept, Mumbai | State Govt. and UT
Tender Id 2025_CMTDM_1164592_1
Reference
Number
MSWC/Comp/SAPHANA/03/2025
Tender Fee 15500
EMD 10 Lakh
Tender Value
Place MSWC 583 B Market Yard Pune
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2024414
Start Date March 28, 2025 17:15
End Date

11/04/2025 ( Expired 45 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Selection of epc contractor for integrated manufacturing cluster imc palakkad

Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.

Read more
Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.

Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.

Read more
Procurement of spares for ew system

Procurement of spares for ew system

Read more
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)

Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)

Read more
Request for proposal (rfp) for the development of public charging stations through public private partnership in identified cities of uttar pradesh

Request for proposal (rfp) for the development of public charging stations through public private partnership in identified cities of uttar pradesh.

Read more
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.

Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.

Read more
Procurement implementation and maintenance of hospital management information system along with required it and ict infrastructure for selected medical college hospitals under medical education and research department govt of assam

Procurement implementation and maintenance of hospital management information system along with required it and ict infrastructure for &amp#x0d selected medical college hospitals&amp#x0d under medical education and research department&amp#x0d govt of assam&amp#x0d

Read more
Selection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023

Selection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise