Tender Details

Particulars Details
Title
Estimate For Providing 23 Nos. House Holds Connection In Village Panjhir Under Pm Da Jgua Scheme Under Goharganj (R) D/C Of Onm Division Obaidullaganj.
Description
Estimate For Providing 23 Nos. House Holds Connection In Village Panjhir Under Pm Da Jgua Scheme Under Goharganj (R) D/C Of Onm Division Obaidullaganj.
Organisation Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | State Govt. and UT
Tender Id 2025_MKVVC_437628_1
Reference
Number
S.NO/DGM/STC/WORK/523/01 DT.16.07.2025
Tender Fee 885
EMD 14000
Tender Value -
Place Raisen
Link
View Original Tender Notice

https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=515547

Start Date July 16, 2025 23:30
End Date
Expired 24/07/2025

Expired 450 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Deposit-da - jgua- tribal multi-purpose marketing centre, cheengeri, sulthan batherytotal station survey work and soil investigation works--investigation work

Deposit-da - jgua- tribal multi-purpose marketing centre, cheengeri, sulthan batherytotal station survey work and soil investigation works--investigation work

Read more
Installation, testing and commissioning of 11 kv line, distribution transformer, lt line and bsnl connection under the bharatnet project in gram panchayats dindori (onm) circle.

Installation, testing and commissioning of 11 kv line, distribution transformer, lt line and bsnl connection under the bharatnet project in gram panchayats dindori (onm) circle.

Read more
S&t work in connection with construction of 6 loop lines between da line and joint line 4 between p and q cabin of bondamunda yard.

S&t work in connection with construction of 6 loop lines between da line and joint line 4 between p and q cabin of bondamunda yard.

Read more
Additional electrification in connection with the false ceiling work at seminar hall, smart classroom and research lab of department of computer science under pm usha scheme

Additional electrification in connection with the false ceiling work at seminar hall, smart classroom and research lab of department of computer science under pm usha scheme

Read more
At noq : electrical estimate for : raising of platform 2/3 as standard height & balance electrical work of noq station in connection with abss.

At noq : electrical estimate for : raising of platform 2/3 as standard height & balance electrical work of noq station in connection with abss.

Read more
Chaurchgate- virar section-refilling and transportation of gas oxygen and gas acetylene (da) to sse (bridge) lower parel & sse(bridge) borivali unit for gas cutting purpose in connection with maintenance of fobs/robs/pipeline bridges and eot crane girders/rail path for two years.

Chaurchgate- virar section-refilling and transportation of gas oxygen and gas acetylene (da) to sse (bridge) lower parel & sse(bridge) borivali unit for gas cutting purpose in connection with maintenance of fobs/robs/pipeline bridges and eot crane girders/rail path for two years.

Read more
Conducting final location survey, traffic survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of bg line in connection with new railway line between dhamtari-gurur-balod (80 km).

Conducting final location survey, traffic survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of bg line in connection with new railway line between dhamtari-gurur-balod (80 km).

Read more
Carrying out final location survey, geotechnical studies, design, preparation of drawings & other preliminary activities for preparing detailed estimate on actual realistic cost in connection with new line between anupgarh to bikaner (131.750km) and spur line from rojhri to khajuwala (54.875 km) of bikaner division of north western railway.

Carrying out final location survey, geotechnical studies, design, preparation of drawings & other preliminary activities for preparing detailed estimate on actual realistic cost in connection with new line between anupgarh to bikaner (131.750km) and spur line from rojhri to khajuwala (54.875 km) of bikaner division of north western railway.

Read more
(a)part-i-detailed estimate of(a)ttr(fs+tws+wcmsc)=26 nos (1 in 8.5=17 nos, 1 in 12=9 nos) (b) ttr(ds)=16 nos, g.total =42 nos in itarsi-narkher section & part-ii-miscellaneous items in connection yard improvement up gradation work of passenger loop in 3 nos. barsali, dharakhoh and barbatpur yard in nagpur division. (b)nagpur division casual renewal of cs, cmsc, tws, ds & ttr(tfr). (c)nagpur division-casual renewal of rails=3.33 kms & casual renewal of sleepers=3.33 kms. (d)nagpur

(a)part-i-detailed estimate of(a)ttr(fs+tws+wcmsc)=26 nos (1 in 8.5=17 nos, 1 in 12=9 nos) (b) ttr(ds)=16 nos, g.total =42 nos in itarsi-narkher section & part-ii-miscellaneous items in connection yard improvement up gradation work of passenger loop in 3 nos. barsali, dharakhoh and barbatpur yard in nagpur division. (b)nagpur division casual renewal of cs, cmsc, tws, ds & ttr(tfr). (c)nagpur division-casual renewal of rails=3.33 kms & casual renewal of sleepers=3.33 kms. (d)nagpur

Read more
Estimate for providing 15 nos. house holds connection in village borpani under pm da-jgua scheme under goharganj (r) d/c of onm division obaidullaganj.

Estimate for providing 15 nos. house holds connection in village borpani under pm da-jgua scheme under goharganj (r) d/c of onm division obaidullaganj.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise