Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Estimate For Providing 23 Nos. House Holds Connection In Village Panjhir Under Pm Da Jgua Scheme Under Goharganj (R) D/C Of Onm Division Obaidullaganj.
|
| Description |
Estimate For Providing 23 Nos. House Holds Connection In Village Panjhir Under Pm Da Jgua Scheme Under Goharganj (R) D/C Of Onm Division Obaidullaganj.
|
| Organisation | Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | State Govt. and UT |
| Tender Id | 2025_MKVVC_437628_1 |
|
Reference Number |
S.NO/DGM/STC/WORK/523/01 DT.16.07.2025 |
| Tender Fee | 885 |
| EMD | 14000 |
| Tender Value | - |
| Place | Raisen |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=515547 |
| Start Date | July 16, 2025 23:30 |
| End Date |
Expired
24/07/2025
Expired 450 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Deposit-da - jgua- tribal multi-purpose marketing centre, cheengeri, sulthan batherytotal station survey work and soil investigation works--investigation work
Deposit-da - jgua- tribal multi-purpose marketing centre, cheengeri, sulthan batherytotal station survey work and soil investigation works--investigation work
Read moreInstallation, testing and commissioning of 11 kv line, distribution transformer, lt line and bsnl connection under the bharatnet project in gram panchayats dindori (onm) circle.
Installation, testing and commissioning of 11 kv line, distribution transformer, lt line and bsnl connection under the bharatnet project in gram panchayats dindori (onm) circle.
Read moreS&t work in connection with construction of 6 loop lines between da line and joint line 4 between p and q cabin of bondamunda yard.
S&t work in connection with construction of 6 loop lines between da line and joint line 4 between p and q cabin of bondamunda yard.
Read moreAdditional electrification in connection with the false ceiling work at seminar hall, smart classroom and research lab of department of computer science under pm usha scheme
Additional electrification in connection with the false ceiling work at seminar hall, smart classroom and research lab of department of computer science under pm usha scheme
Read moreAt noq : electrical estimate for : raising of platform 2/3 as standard height & balance electrical work of noq station in connection with abss.
At noq : electrical estimate for : raising of platform 2/3 as standard height & balance electrical work of noq station in connection with abss.
Read moreChaurchgate- virar section-refilling and transportation of gas oxygen and gas acetylene (da) to sse (bridge) lower parel & sse(bridge) borivali unit for gas cutting purpose in connection with maintenance of fobs/robs/pipeline bridges and eot crane girders/rail path for two years.
Chaurchgate- virar section-refilling and transportation of gas oxygen and gas acetylene (da) to sse (bridge) lower parel & sse(bridge) borivali unit for gas cutting purpose in connection with maintenance of fobs/robs/pipeline bridges and eot crane girders/rail path for two years.
Read moreConducting final location survey, traffic survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of bg line in connection with new railway line between dhamtari-gurur-balod (80 km).
Conducting final location survey, traffic survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of bg line in connection with new railway line between dhamtari-gurur-balod (80 km).
Read moreCarrying out final location survey, geotechnical studies, design, preparation of drawings & other preliminary activities for preparing detailed estimate on actual realistic cost in connection with new line between anupgarh to bikaner (131.750km) and spur line from rojhri to khajuwala (54.875 km) of bikaner division of north western railway.
Carrying out final location survey, geotechnical studies, design, preparation of drawings & other preliminary activities for preparing detailed estimate on actual realistic cost in connection with new line between anupgarh to bikaner (131.750km) and spur line from rojhri to khajuwala (54.875 km) of bikaner division of north western railway.
Read more(a)part-i-detailed estimate of(a)ttr(fs+tws+wcmsc)=26 nos (1 in 8.5=17 nos, 1 in 12=9 nos) (b) ttr(ds)=16 nos, g.total =42 nos in itarsi-narkher section & part-ii-miscellaneous items in connection yard improvement up gradation work of passenger loop in 3 nos. barsali, dharakhoh and barbatpur yard in nagpur division. (b)nagpur division casual renewal of cs, cmsc, tws, ds & ttr(tfr). (c)nagpur division-casual renewal of rails=3.33 kms & casual renewal of sleepers=3.33 kms. (d)nagpur
(a)part-i-detailed estimate of(a)ttr(fs+tws+wcmsc)=26 nos (1 in 8.5=17 nos, 1 in 12=9 nos) (b) ttr(ds)=16 nos, g.total =42 nos in itarsi-narkher section & part-ii-miscellaneous items in connection yard improvement up gradation work of passenger loop in 3 nos. barsali, dharakhoh and barbatpur yard in nagpur division. (b)nagpur division casual renewal of cs, cmsc, tws, ds & ttr(tfr). (c)nagpur division-casual renewal of rails=3.33 kms & casual renewal of sleepers=3.33 kms. (d)nagpur
Read moreEstimate for providing 15 nos. house holds connection in village borpani under pm da-jgua scheme under goharganj (r) d/c of onm division obaidullaganj.
Estimate for providing 15 nos. house holds connection in village borpani under pm da-jgua scheme under goharganj (r) d/c of onm division obaidullaganj.
Read moreof your Industry type