Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
26(01)/Iitgnped/2024
|
Description |
Construction Of Permanent Campus Of Central University Of Gujarat At Village: Kundhela, Dist: Vadodara, Gujarat (Phase 1)
|
Organisation | Central Public Works Department (CPWD) | Central Govt. Ministry/Department |
Tender Id | 78129 |
Reference Number |
26(01)/IITGNPED/2024 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | |
Link | https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=637077642463707764243738313239243236283031292f494954474e5045442f32303234 |
Start Date | June 14, 2024 05:47 |
End Date |
19/06/2024 ( Expired 380 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreConstruction of residential building phase 1 at midc on cts nos 42 pt of village kondivate, k east ward of metro line 3 at midc metro station, andheri east.
Construction of residential building phase 1 at midc on cts nos 42 pt of village kondivate, k east ward of metro line 3 at midc metro station, andheri east.
Read moreConstruction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.
Construction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.
Read moreConstruction of shed and office cum guard room for separation at trenching ground molimohgaon (augmentation of existing processing facility for solid waste management) mandla dist. mandla (m.p.)
Construction of shed and office cum guard room for separation at trenching ground molimohgaon (augmentation of existing processing facility for solid waste management) mandla dist. mandla (m.p.)
Read moreDesign and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package a
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package a
Read moreDesign and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package b
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package b
Read moreConsultancy services for authoritys engineer for supervision of construction of a-vop at manegaon village at km 468.260 (wainganga bridge to mh/cg border section of nh-53) and b-vop at km 120.213 at basamba phata (washim-pangare section of on nh-161
Consultancy services for authoritys engineer for supervision of construction of a-vop at manegaon village at km 468.260 (wainganga bridge to mh/cg border section of nh-53) and b-vop at km 120.213 at basamba phata (washim-pangare section of on nh-161
Read moreConstruction of 1 no bay and its allied civil works for 66 kv s s jalal at 66 kv s s bhagta bhai ka under op. circle, bathinda
Construction of 1 no bay and its allied civil works for 66 kv s s jalal at 66 kv s s bhagta bhai ka under op. circle, bathinda
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreof your Industry type