Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Major Bridge Across Trikhuri River At Ch 11/500 Kurkheda Talegaon Palasgad Charbhatti Dongargaon Road To Join Nh 543 Mdr 46 In Tah Kurkheda, Dist Gadchiroli
|
Description |
Construction Of Major Bridge Across Trikhuri River At Ch 11/500 Kurkheda Talegaon Palasgad Charbhatti Dongargaon Road To Join Nh 543 Mdr 46 In Tah Kurkheda, Dist Gadchiroli
|
Organisation | Public Works Region | State Govt. and UT |
Tender Id | 2024_PWR_1049412_1 |
Reference Number |
NAG/GAD/GAD1/02 (Open) of 2024-2025 |
Tender Fee | 2360 |
EMD | 1.5 Lakh |
Tender Value | |
Place | Kurkheda |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1832189 |
Start Date | July 08, 2024 18:35 |
End Date |
19/07/2024 ( Expired 278 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Read moreConstruction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra
Construction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra
Read moreWidening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Read moreCrif - construction of thadiyanpadu bridge periyar river connecting nh-185 to state road mdr in idukki district in the state of kerala civil work general civil work
Construction of thadiyanpadu bridge across periyar river connecting nh-185 to state road (mdr) in idukki district in the state of kerala - construction of bridge and amenities
Read moreWidening of existing road 2 laning stretch into 4 lane configuration in phaltan city ch 138 250 to ch 144 425 and construction of new rob at km 179 730 existing km 61 100 of nh 965 in the state of maharashtra
Widening of existing road 2 laning stretch into 4 lane configuration in phaltan city ch 138 250 to ch 144 425 and construction of new rob at km 179 730 existing km 61 100 of nh 965 in the state of maharashtra
Read moreConstruction of a new 2 lane parallel bridge,approach road, and protection works near the damaged long bridge at kilometer 38 over the sot river on shahabad- bisauli-kachhla ganga ghat (nh-109) route in district badaun.
Construction of a new 2 lane parallel bridge,approach road, and protection works near the damaged long bridge at kilometer 38 over the sot river on shahabad- bisauli-kachhla ganga ghat (nh-109) route in district badaun.
Read moreRepairs to major bridge at. ch. 16/800 on changefal bhendwal bhastan matergaon jalmb khamgaon road sh-222 in khamgaon tahasil dist. buldhana (2nd call)
Repairs to major bridge at. ch. 16/800 on changefal bhendwal bhastan matergaon jalmb khamgaon road sh-222 in khamgaon tahasil dist. buldhana (2nd call)
Read moreConsultancy services for preparation of detailed project report (dpr) for (1).construction of 4l rob at km 33.100 and km 35.660 (2) 4l major bridge at km 32.000 (3). upgradation to 4 lane from km 45.400 to km 46.200 on nh-330b in the state of up.
Consultancy services for preparation of detailed project report (dpr) for (1).construction of 4l rob at km 33.100 and km 35.660 (2) 4l major bridge at km 32.000 (3). upgradation to 4 lane from km 45.400 to km 46.200 on nh-330b in the state of up.
Read moreConstruction of 5 nos. major bridges at km 88.200 (ful-chhindgarh river), km. 122.600 (malger river), km. 145.000 (penta nalah), km. 163.400 (errabor river) and km. 176.600 (injaram nalah) on nh-30 (old nh-221) jagdalpur-sukma-konta road in the state
Construction of 5 nos. major bridges at km 88.200 (ful-chhindgarh river), km. 122.600 (malger river), km. 145.000 (penta nalah), km. 163.400 (errabor river) and km. 176.600 (injaram nalah) on nh-30 (old nh-221) jagdalpur-sukma-konta road in the state
Read moreConstruction of foot over bridge at package v of nh.66 at parshuram ghat and kamthe parshuram ghat.arawali section and service road, bus bay with bus shelter etc dist. ratnagiri in state of maharashtra. annual plan 2024-25
Construction of foot over bridge at package v of nh.66 at parshuram ghat and kamthe parshuram ghat.arawali section and service road, bus bay with bus shelter etc dist. ratnagiri in state of maharashtra. annual plan 2024-25
Read moreof your Industry type