Tender Details
Particulars | Details |
---|---|
Title |
Development Of Commercial Pocket A 542 Acre At Patiala Rajpura Road Urban Estate Phase 3 At Patiala
|
Description |
Development Of Commercial Pocket A 542 Acre At Patiala Rajpura Road Urban Estate Phase 3 At Patiala
|
Organisation | Department of Housing and Urban Development | State Govt. and UT |
Tender Id | 2024_DHUD_123923_1 |
Reference Number |
E-tender/139/PDA/DEC/24/16039 |
Tender Fee | 5901 |
EMD | 8.74 Lakh |
Tender Value | |
Place | Patiala |
Link | https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=252341 |
Start Date | July 15, 2024 21:30 |
End Date |
05/08/2024 ( Expired 283 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreRectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Read moreDevelopment of commercial complex with citizen facilitation centre project at sokta bhawansite near agrasen sq. c a road, gandhibagh, nagpur
Development of commercial complex with citizen facilitation centre project at sokta bhawansite near agrasen sq. c a road, gandhibagh, nagpur
Read moreConstruction and maintenance of road and storm water drainage system etc at bodhjungnagar industrial estate tripura adb project package 02
Construction and maintenance of road and storm water drainage system etc at bodhjungnagar industrial estate tripura adb project package 02
Read moreRepair/re-carpeting of certain stretches of main / subsidiary / internal roads, adjoining shoulders, berms, kerbs incl necessary road furniture within cantt at mil stn jamnagar
Repair/re-carpeting of certain stretches of main / subsidiary / internal roads, adjoining shoulders, berms, kerbs incl necessary road furniture within cantt at mil stn jamnagar
Read moreSweeping of roads in urban estate sector 32-a, 33, 39-a and sector-40, samrala road, ludhiana and urban estate phase-3 and 200 feet wide road dugri road, ludhiana (from 01.04.2025 to 31.03.2026)
Sweeping of roads in urban estate sector 32-a, 33, 39-a and sector-40, samrala road, ludhiana and urban estate phase-3 and 200 feet wide road dugri road, ludhiana (from 01.04.2025 to 31.03.2026)
Read more420/construction of cc road in front of soda factory gate at ward no. 3 nagar parishad bargawan amlai
Construction of cc drain 1 gudiya baiga house to shani baiga house 2 chhotu baiga house to shakola road 3 shankar agariya house prakash house at ward no. 11 nagar parishad bargawan amlai
Read more420/construction of cc road in front of soda factory gate at ward no. 3 nagar parishad bargawan amlai
420/construction of cc road in front of soda factory gate at ward no. 3 nagar parishad bargawan amlai
Read moreConstruction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.
Construction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.
Read moreC/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd
C/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd
Read moreof your Industry type