Tender Details

Particulars Details
Title
Development Of Commercial Pocket A 542 Acre At Patiala Rajpura Road Urban Estate Phase 3 At Patiala
Description
Development Of Commercial Pocket A 542 Acre At Patiala Rajpura Road Urban Estate Phase 3 At Patiala
Organisation Department of Housing and Urban Development | State Govt. and UT
Tender Id 2024_DHUD_123923_1
Reference
Number
E-tender/139/PDA/DEC/24/16039
Tender Fee 5901
EMD 8.74 Lakh
Tender Value
Place Patiala
Link https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=252341
Start Date July 15, 2024 21:30
End Date

05/08/2024 ( Expired 283 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode

Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode

Read more
Development of commercial complex with citizen facilitation centre project at sokta bhawansite near agrasen sq. c a road, gandhibagh, nagpur

Development of commercial complex with citizen facilitation centre project at sokta bhawansite near agrasen sq. c a road, gandhibagh, nagpur

Read more
Construction and maintenance of road and storm water drainage system etc at bodhjungnagar industrial estate tripura adb project package 02

Construction and maintenance of road and storm water drainage system etc at bodhjungnagar industrial estate tripura adb project package 02

Read more
Repair/re-carpeting of certain stretches of main / subsidiary / internal roads, adjoining shoulders, berms, kerbs incl necessary road furniture within cantt at mil stn jamnagar

Repair/re-carpeting of certain stretches of main / subsidiary / internal roads, adjoining shoulders, berms, kerbs incl necessary road furniture within cantt at mil stn jamnagar

Read more
Sweeping of roads in urban estate sector 32-a, 33, 39-a and sector-40, samrala road, ludhiana and urban estate phase-3 and 200 feet wide road dugri road, ludhiana (from 01.04.2025 to 31.03.2026)

Sweeping of roads in urban estate sector 32-a, 33, 39-a and sector-40, samrala road, ludhiana and urban estate phase-3 and 200 feet wide road dugri road, ludhiana (from 01.04.2025 to 31.03.2026)

Read more
420/construction of cc road in front of soda factory gate at ward no. 3 nagar parishad bargawan amlai

Construction of cc drain 1 gudiya baiga house to shani baiga house 2 chhotu baiga house to shakola road 3 shankar agariya house prakash house at ward no. 11 nagar parishad bargawan amlai

Read more
420/construction of cc road in front of soda factory gate at ward no. 3 nagar parishad bargawan amlai

420/construction of cc road in front of soda factory gate at ward no. 3 nagar parishad bargawan amlai

Read more
Construction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.

Construction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.

Read more
C/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd

C/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise