Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply,Erection,Testing And Commissioning Including Balance Rectification Works For Establishing Ht Supply From Tangedco At Erumaiyur Quarries Including Outsourcing Of Operation And Maintenance Of All The Infrastructures Including The Four Mld Wtp
|
| Description |
Supply,Erection,Testing And Commissioning Including Balance Rectification Works For Establishing Ht Supply From Tangedco At Erumaiyur Quarries Including Outsourcing Of Operation And Maintenance Of All The Infrastructures Including The Four Mld Wtp
|
| Organisation | CMWSS Board | State Govt. and UT |
| Tender Id | 2024_CMWSS_486547_1 |
|
Reference Number |
CNT/WSS/MWB/3636/2024-25 |
| Tender Fee | 0 |
| EMD | 1.45 Lakh |
| Tender Value | |
| Place | Chennai |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=578938 |
| Start Date | September 26, 2024 20:30 |
| End Date |
Expired
03/10/2024
Expired 634 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Eoi document for selection of consortium partner for design supply installation testing commissioning and operation maintenance of atms projects in zone1 delhi region on epc mode
Eoi document for selection of consortium partner for design supply installation testing commissioning and operation maintenance of atms projects in zone1 delhi region on epc mode
Read moreSupply installation testing commissioning operation and maintenance of centralized control and monitoring system ccms for highway lighting on national highways under r and b nh wing goa on five 05 year contract basis.
Supply installation testing commissioning operation and maintenance of centralized control and monitoring system ccms for highway lighting on national highways under r and b nh wing goa on five 05 year contract basis.
Read moreSurvey, design, fabrication, supply, installation, testing and commissioning of total 21.00 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 3 years
Survey, design, fabrication, supply, installation, testing and commissioning of total 21.00 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 3 years
Read moreSupply, erection, testing, commissioning of balance works for establishing ht supply from tangedco at sikkarayapuram quarries including outsourcing of maintenance of all the infrastructures with manpower for watch and ward and prive maintenance
Supply, erection, testing, commissioning of balance works for establishing ht supply from tangedco at sikkarayapuram quarries including outsourcing of maintenance of all the infrastructures with manpower for watch and ward and prive maintenance
Read moreDesign, fabrication, supply, installation, testing and commissioning of air vessel based surge protection system
Design, fabrication, supply, installation, testing and commissioning of air vessel based surge protection system with allied civil works in 191 mld wtp at kharguli and surge relief valves at clear water pumping main from the wtp kharguli to ramsahill
Read moreDesign, manufacture, supply, storage, erection, testing, commissioning of all electrical items for wtp electrical substation at shalimar station
Design, manufacture, supply, storage, erection, testing, and commissioning of all the electrical items, equipment, and accessories as required to run the system efficiently for wtp substation shalimar station building
Read moreSupply, installation, testing and commissioning of lt control panel at 12 mld wtp opa.
Supply, installation, testing and commissioning of lt control panel at 12 mld wtp opa.
Read moreErection, testing and commissioning of ht and lt electrical works
Erection, testing and commissioning of ht and lt electrical works for the flue gas desulphurization system and its auxiliaries for all five units and common systems of fgd including handling of materials.
Read moreExecution, testing , commissioning of balance work of all system
Execution, testing , commissioning of balance work of all system component of digboi town water supply scheme ,with surface water source from river buri-dihing by installing intake well) including two months trial run for providing 3.90 mld treated
Read moreOperation and maintenance of water testing laboratory at 245 mld wtp campus siddharth vihar ghaziabad
Operation and maintenance of water testing laboratory at 245 mld wtp campus siddharth vihar ghaziabad
Read moreof your Industry type