Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Renewal Work Along With General Repairs Of Agra Fatehpur Sikari To Nagla Kachhiyan Road
|
Description |
Renewal Work Along With General Repairs Of Agra Fatehpur Sikari To Nagla Kachhiyan Road
|
Organisation | Chief Engineer Agra Zone PWD Agra UP | State Govt. and UT |
Tender Id | 2024_CEAGR_902271_15 |
Reference Number |
688/9A-PD/2024 Dated 19/02/2024 |
Tender Fee | 677 |
EMD | 45000 |
Tender Value | |
Place | Agra |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1554045 |
Start Date | February 22, 2024 17:30 |
End Date |
27/02/2024 ( Expired 486 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreWork of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.
Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2lane with paved shoulders in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2lane with paved shoulders in the state of madhya pradesh on epc mode
Read moreConsultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh
Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh
Read moreDesign and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package a
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package a
Read moreDesign and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package b
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package b
Read moreUp-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreof your Industry type