Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ctr (Complete Track Renewal) Work Of 2.5 Km Rail Track In Obra Thermal Power Station,Obra
|
| Description |
Ctr (Complete Track Renewal) Work Of 2.5 Km Rail Track In Obra Thermal Power Station,Obra
|
| Organisation | UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT |
| Tender Id | 2025_RVUNL_1016319_1 |
|
Reference Number |
T-29/SE-V/BTPS/CHD-I/2024-25 |
| Tender Fee | 1180 |
| EMD | 95000 |
| Tender Value | - |
| Place | Obra Thermal Power Station |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1831797 |
| Start Date | March 11, 2025 22:30 |
| End Date |
Expired
07/04/2025
Expired 554 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Abrasive disc type rail cutter,rail roller,j clamp for ballastless track,rail dolly adequately insulated,erc applicator panpuller,rail jack for ballastless track
Abrasive disc type rail cutter,rail roller,j clamp for ballastless track,rail dolly adequately insulated,erc applicator panpuller,rail jack for ballastless track
Read moreMotorised guided rail track lifting arrangement
Motorised guided rail track lifting arrangement
Read more310006891 - ur5p605-complete mech. seal, double tandem - rcfl mumbai,300117261 - ur5p608, 2.5 complete seal assembly - rcfl mumbai
310006891 - ur5p605-complete mech. seal, double tandem - rcfl mumbai,300117261 - ur5p608, 2.5 complete seal assembly - rcfl mumbai
Read moreInstallation testing and commissioning of glued rail jointing entry and exit and associated track leveling, packing, and maintenance works at 140 ton rail weighbridge site
Installation,testing and commissioning of glued rail jointing entry and exit and associated track leveling, packing, and maintenance works at 140 ton rail weighbridge site
Read moreReplacement of crane rail track for rmqc (rail mounted quay crane) including allied works at berth no. 11 and 12 in dock area, h.d.c, haldia
Replacement of crane rail track for rmqc (rail mounted quay crane) including allied works at berth no. 11 and 12 in dock area, h.d.c, haldia
Read moreDismantling of ballast less track of oil decanting rail siding in sstpp, dongalia for gct-i.
Dismantling of ballast less track of oil decanting rail siding in sstpp, dongalia for gct-i.
Read moreRenewal of aged track feed charger with integrated failure alarm system over hwh division er
Renewal of aged track feed charger with integrated failure alarm system over hwh division er
Read moreRegular cleaning of drains adjacent to track hopper and rail line and other related works inside plant at dvc, rtps.
Regular cleaning of drains adjacent to track hopper and rail line and other related works inside plant at dvc, rtps.
Read moreHalf sleeve t shirt,knicker,jersey full sleeve,track suit set,full sleeve t shirt,winter pant,socks summer and winter,thermal set
Half sleeve t shirt,knicker,jersey full sleeve,track suit set,full sleeve t shirt,winter pant,socks summer and winter,thermal set
Read moreTrack-i - sitc and operationalization of the ai cloud,track-ii - sitc of dc infra non-it in epc mode with o and m,track-ii - sicbo of the ai cloud it infrastructure,any other services, allied works etc.,any other items, component etc. required to complete the solution.
Track-i - sitc and operationalization of the ai cloud,track-ii - sitc of dc infra non-it in epc mode with o and m,track-ii - sicbo of the ai cloud it infrastructure,any other services, allied works etc.,any other items, component etc. required to complete the solution.
Read moreof your Industry type