Tender Details
About Tender
🏗️ Invitation For Bids: Paste Fill/Backfill Technology For Secl's Singhali Ug Mine 🏛️ South Eastern Coalfields Limited (Secl), A Public Sector Undertaking, Is Seeking Bids From Experienced Vendors For The Setting Of Paste Fill/Backfill/Any Other Suitable Technology With Mass Production Technology/Continuous Cutting Technology In The Singhali Ug Mine, Korba Area, Chhattisgarh. 📅 Bid Submission Deadline: June 03, 2024, 5:00 Pm The Project Will Be Executed On A Boo (Build, Own, Operate) Basis. Interested Bidders Are Required To Submit An Earnest Money Deposit (Emd) Of Inr 5 Crore. Bidders Are Encouraged To Propose Innovative Solutions That Align With The Project's Objectives And Demonstrate Their Expertise In This Field. Keywords: Paste Fill/Backfill, Mass Production Technology, Continuous Cutting Technology, Singhali Ug Mine, Korba Area, Secl, Boo Basis, Tender, Bid, EmdParticulars | Details |
---|---|
Title |
Setting Of Paste Fill/Backfill/Any Other Suitable Technology With Mass Production Technology/Continuous Cutting Technology As Suitably Proposed By The Bidder In Singhali Ug Mines Of Korba Area Of Secl
|
Description |
Setting Of Paste Fill/Backfill/Any Other Suitable Technology With Mass Production Technology/Continuous Cutting Technology As Suitably Proposed By The Bidder In Singhali Ug Mines Of Korba Area Of Secl On Boo (Build, Own, Operate) Basis
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_SECL_306284_1 |
Reference Number |
SECL/CMC-Global/KRB/24-25/607 DT04.04.24 |
Tender Fee | 0 |
EMD | 50 Lakh |
Tender Value | |
Place | Singhali UG Mine, Korba Area, Dist- Korba, CG |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=317382 |
Start Date | May 03, 2024 15:30 |
End Date |
03/06/2024 ( Expired 352 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Introduction of 01 no. of low height continuous miner package on hiring basis for winning coal without blasting for depillaring operation at rajendra ug mine, sohagpur area, secl and details as per boq and nit.
Introduction of 01 no. of low height continuous miner package on hiring basis for winning coal without blasting for depillaring operation at rajendra ug mine, sohagpur area, secl and details as per boq and nit.
Read moreTtps es circle em i providing temporary lt 3 phase supply arrangement for various overhauling works connected with tm i and cmd i and other emergency lighting works in p h area and disconnection of power cables of various valve motors as demanded by
Ttps es circle em i providing temporary lt 3 phase supply arrangement for various overhauling works connected with tm i and cmd i and other emergency lighting works in p h area and disconnection of power cables of various valve motors as demanded by
Read morePre nit notice for introduction of low height continuous miner packages (2 sets) with paste fill technology at shampur-b colliery of mugma area of ecl.
Pre nit notice for introduction of low height continuous miner packages (2 sets) with paste fill technology at shampur-b colliery of mugma area of ecl
Read moreSetting of paste fill/backfill/any other suitable technology with mass production technology/continuous cutting technology as suitably proposed by the bidder in singhali ug mines of korba area of secl
Setting of paste fill/backfill/any other suitable technology with mass production technology/continuous cutting technology as suitably proposed by the bidder in singhali ug mines of korba area of secl on boo (build, own, operate) basis
Read moreSupply of drinking water by 3000 litres capacity tractor mounted tanker from filter plant and singhali ug mine to nearby villages of dsb sub area under korba area for 03 months.
Supply of drinking water by 3000 litres capacity tractor mounted tanker from filter plant and singhali ug mine to nearby villages of dsb sub area under korba area for 03 months.
Read moreExtraction of 7.20 lakh tonnes (lt) of coal over a period of 5 apps on cost per tonne basis by using intermediate technology i.e. drilling, blasting and loading with suitable capacity of sdls at under ground mine of ktk oc iii project, bhupalapalli area, scco.ltd.
Extraction of 7.20 lakh tonnes (lt) of coal over a period of 5 apps on cost per tonne basis by using intermediate technology i.e. drilling, blasting and loading with suitable capacity of sdls at under ground mine of ktk oc iii project, bhupalpalli area, scco.ltd.
Read moreSetting of pastefill/backfill/any other suitable technology with mass production technology/continuous cutting technology in singhali ug mines of korba area of secl which does not damage the surface and without obtaining surface right for depillaring
Setting of pastefill/backfill/any other suitable technology with mass production technology/continuous cutting technology in singhali ug mines of korba area of secl which does not damage the surface and without obtaining surface right for ...
Read moreof your Industry type