Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
S I And C Of Various Electrical Equipment Such As Battery Charger Etc At Shp Biaras And Chilong.
|
| Description |
S I And C Of Various Electrical Equipment Such As Battery Charger Etc At Shp Biaras And Chilong.
|
| Organisation | LAHDC - Kargil | State Govt. and UT |
| Tender Id | 2024_LAHDC_13544_1 |
|
Reference Number |
01-KREDA of 2024 |
| Tender Fee | 200 |
| EMD | 51000 |
| Tender Value | - |
| Place | Kargil |
| Link |
View Original Tender Notice
https://tenders.ladakh.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=33923 |
| Start Date | July 30, 2024 21:00 |
| End Date |
Expired
07/08/2024
Expired 796 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Change of display board name from ghmc to cyberabad municipal corporation at various places such as parks, community halls, graveyards, etc. in ward no.s 243,244 and 248, allwyn colony circle-51, kukatpally zone, cmc
Change of display board name from ghmc to cyberabad municipal corporation at various places such as parks, community halls, graveyards, etc. in ward no.s 243,244 and 248, allwyn colony circle-51, kukatpally zone, cmc
Read moreProviding transformer oil filtration, supply of transformer oil, 11kv horn gap fuses, 95sq.mm lt cable, fencing to sub-station, etc., in place of de-functioning equipment at 11kv/433v at electrical sub-station at division office premises, under eam cell of o and m.division-22, kukatpally zone, cyberabad.
Providing transformer oil filtration, supply of transformer oil, 11kv horn gap fuses, 95sq.mm lt cable, fencing to sub-station, etc., in place of de-functioning equipment at 11kv/433v at electrical sub-station at division office premises, under eam cell of o and m.division-22, kukatpally zone, cyberabad.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreRepairing of spillway and tailrace of shp biaras drass
Repairing of spillway and tailrace of shp biaras drass
Read moreSupply fixing and erection of 500mm dia gate valve of shp biaras
Supply fixing and erection of 500mm dia gate valve of shp biaras
Read moreGovernor programming commissioning and automation of avr for synchronization of the chilong shp
Governor programming commissioning and automation of avr for synchronization of the chilong shp
Read moreRegulated battery charger etc.
For complete deion and other details, please refer to tender
Read moreof your Industry type