Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Nit 23 Sl 02 Earth Filling For Construction Of Approach Road
|
| Description |
Earth Filling For Construction Of Approach Road Both Side As Supplementary Item For Construction Of 36 Meter Long Rsj Bridge Over River Bitra, Kumtirghat At Marichbari Kholta Gp Under Cooch Behar Ii Develeopment Block
|
| Organisation | Zilla Parishad | State Govt. and UT |
| Tender Id | 2024_ZPHD_778238_1 |
|
Reference Number |
NIT No.-23/EO/COB-II PS/2024-25 SL 01 to 02 |
| Tender Fee | 500 |
| EMD | 6900 |
| Tender Value | |
| Place | WITH COOCH BEHAR II PANCHAYAT SAMITY JURISDICTIO |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1723644 |
| Start Date | December 03, 2024 22:25 |
| End Date |
Expired
11/12/2024
Expired 587 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Construction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreNit 04/bgp/23-24 sl-02
Construction of cc road from the house of nimai munda towards pmgsy road at sansad vii under bishpur gram panchayat
Read moreNandigram/e-nit-38/23-24, sl-02
Construction of concrete road from kishore gayens house to ramkrishna gayens house at nandigram-x sansad
Read moreNandigram/e-nit-35/23-24, sl-02
Construction of concrete road from chandan das house to manoranjan das house at nandigram-vii sansad
Read moreof your Industry type