Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Designing, Providing, Installation And Commissioning Of Solar Engery Based Bore Well Water Pumping System Including Comprehensive O And M For A Period Of Five Year And Drilling Of Tube Well Bore Holes In Various Villages Habitations In Block Pratap
|
Description |
Designing, Providing, Installation And Commissioning Of Solar Engery Based Bore Well Water Pumping System Including Comprehensive O And M For A Period Of Five Year And Drilling Of Tube Well Bore Holes In Various Villages Habitations In Block Pratap
|
Organisation | Panchayati Raj Department | State Govt. and UT |
Tender Id | 2024_PRD_436091_1 |
Reference Number |
NIT No 03/2024-24 PS Pratapgarh |
Tender Fee | 2000 |
EMD | 3.2 Lakh |
Tender Value | |
Place | PRATAPGARH |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=783860 |
Start Date | December 09, 2024 21:30 |
End Date |
14/12/2024 ( Expired 203 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreDes, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.
Des, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.
Read morePackage 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.
Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.
Read moreSupply, installation and maintenance of smart public address system (turnkey project) in gwalior city with 5-year comprehensive amc in gwalior
Supply, installation and maintenance of smart public address system (turnkey project) in gwalior city with 5-year comprehensive amc in gwalior
Read moreEpc package for setting up of 951 mw solar projects 74 nos under mskvy 2.0 pm kusum component c in the state of maharashtra including comprehensive o and m for three years
Epc package for setting up of 951 mw solar projects 74 nos under mskvy 2.0 pm kusum component c in the state of maharashtra including comprehensive o and m for three years
Read moreSurvey, design, manufacture, supply, installation, testing, commissioning 4000 nos. white led (w-led) based solar based home light systems (solar power pack) in various villages of jalgaon district with comprehensive maintenance contract for 5yr
Survey, design, manufacture, supply,&#x0d installation, testing, commissioning 4000 nos.&#x0d white led (w-led) based solar based home light&#x0d systems (solar power pack) in various villages of jalgaon district with comprehensive&#x0d maintenance contract for 5yr
Read moreTender for supply, installation, training and commissioning of electrolyser setup for decoupled water splitting with accessories
Tender for supply, installation, training and commissioning of electrolyser setup for decoupled water splitting with accessories with one year on-site all inclusives comprehensive warranty period as per the specifications attached in section 3.
Read moreDesign, construction, supply, erection, testing and commissioning of tertiary treatment by disc filter system for 5.6 mld capacity stp at baga including comprehensive o and m for 3 years
Design, construction, supply, erection, testing and commissioning of tertiary treatment by disc filter system for 5.6 mld capacity stp at baga including comprehensive o and m for 3 years
Read moreDesign, construction, supply, erection, testing and commissioning of tertiary treatment by sand and carbon filter system for 2 mld capacity stp at patto including comprehensive o and m for 3 years
Design, construction, supply, erection, testing and commissioning of tertiary treatment by sand and carbon filter system for 2 mld capacity stp at patto including comprehensive o and m for 3 years
Read more(nib_08) work of construction of rgfp, cwr, ph and rising pl at the phulad dam, marwar junction to provide clean drinking water to six villages of gram panchayat phulad including 5 year o and m after 1 year defect liability period under budget annou
(nib_08) work of construction of rgfp, cwr, ph and rising pl at the phulad dam, marwar junction to provide clean drinking water to six villages of gram panchayat phulad including 5 year o and m after 1 year defect liability period under budget annou
Read moreof your Industry type