Tender Details

About Tender

🏗️ Construction Opportunity: Broad Gauge Line Extension 🚂 The Ministry Of Railways, Central Government, Invites Tenders For The Construction Of A New Broad Gauge Line Between Chainage 25.400 To 66.400 (41.000 Km) In The Tumkur Chitradurga Davangere Project. This Includes Electrical, Signal, And Telecommunication Works From Thimmarajanahalli (Excl.) To Tavarekere (Incl.) Stations, Located In Hubli. 📅 Bid Submission Deadline: August 23, 2024, 11:00 Am A Tender Fee Of Inr 2,00,00,000 Must Be Submitted With The Bid. Interested Contractors Must Possess The Requisite Expertise And Resources To Undertake Complex Infrastructure Projects. Detailed Tender Documents Are Available For Review To Ensure Compliance With Project Specifications And Timelines. Keywords: Construction, Broad Gauge Line, Railway Infrastructure, Electrical, Signal, Telecommunication, Ministry Of Railways, Government Tender, Tumkur Chitradurga Davangere Project, Hubli
Particulars Details
Title
Construction Of New Broad Gauge Line Between Chainage 25.400 &Amp Chainage 66.400 (41.000 Km) Including Electrical, Signal &Amp Telecommunication, Works Between Thimmarajanahalli (Excl.)&Amp Tavarekere (Incl.) Stations In Tumkur Chitradurga Davangere Project
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 74814401
Reference
Number
TK-DVG-EPC-03
Tender Fee 0
EMD 2 Crore
Tender Value
Place Hubli
Link https://www.ireps.gov.in/ireps/works/pdfdocs/082024/74814401/viewNitPdf_4550482.pdf
Start Date April 25, 2024 23:30
End Date

23/08/2024 ( Expired 241 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of new 4 lane with paved shoulder from dareota village to kalar bala village of nh-205 (design chainage km.33.175 to km 41.000 design length 7.825 km) including twin tube tunnel packageiib in himachal pradesh under nh (o) on ham

Construction of new 4 lane with paved shoulder from dareota village to kalar bala village of nh-205 (design chainage km.33.175 to km 41.000 design length 7.825 km) including twin tube tunnel packageiib in himachal pradesh under nh (o) on ham

Read more
Work of installation of 01 new tube well of 35 hp capacity in ward-32 moh rampur garden along with construction of pump house, electrical connection, laying of rising main line and other related works.

Work of installation of 01 new tube well of 35 hp capacity in ward-32 moh rampur garden along with construction of pump house, electrical connection, laying of rising main line and other related works.

Read more
Work of installation of 01 new tube well of 35 hp capacity in ward-06 nawada shekhan along with construction of pump house, electrical connection, laying of rising main line and other related works.

Work of installation of 01 new tube well of 35 hp capacity in ward-06 nawada shekhan along with construction of pump house, electrical connection, laying of rising main line and other related works.

Read more
General-pwd rest house ponnani phase-ii-construction of new building for pwd rest house ponnani phase-ii (additional works) in malappuram dt(ponnani l.a.c)-fire protection system-electrical fire fighting work

General-pwd rest house ponnani&amp#x0d phase-ii-construction of new building for&amp#x0d pwd rest house ponnani phase-ii (additional&amp#x0d works) in malappuram dt(ponnani l.a.c)-fire&amp#x0d protection system-electrical fire fighting&amp#x0d work

Read more
Work of installation of 01 new tube well of 35 hp capacity in ward-06 nawada shekhan along with construction of pump house, electrical connection, laying of rising main line and other related works.

Work of installation of 01 new tube well of 35 hp capacity in ward-06 nawada shekhan along with construction of pump house, electrical connection, laying of rising main line and other related works.

Read more
Construction of rob at km 1/8 of namakkal bypass road km 0/8-2/2 incl. railway portion at railway km 47/5-6 in between kalangani and namakkal railway stations in sa-krr section in the main work of forming bypass to namakkal town km 0/8-6/0 (phase-ii)

Construction of rob at km 1/8 of namakkal bypass road km 0/8-2/2 incl. railway portion at railway km 47/5-6 in between kalangani and namakkal railway stations in sa-krr section in the main work of forming bypass to namakkal town km 0/8-6/0 (phase-ii)

Read more
Construction of new a site retail outlet with facilities like sales building paver block driveway and other allied civil electrical works at location village bijori between km stone 76 to 78 on dedtalai burhanpur road district burhanpur adv loc 1246

Construction of new a site retail outlet with facilities like sales building paver block driveway and other allied civil electrical works at location village bijori between km stone 76 to 78 on dedtalai burhanpur road district burhanpur adv loc 1246

Read more
Estimate no 1855/ngp/2024 25 providing shifting of electrical utilities due to construction of flyover on umred butibori road ( msh 06) km 61 00 to 63 00 between kanhva to shirpur village in r o the section engineer ( electrical ) public works mla

Estimate no 1855/ngp/2024 25 providing shifting of electrical utilities due to construction of flyover on umred butibori road ( msh 06) km 61 00 to 63 00 between kanhva to shirpur village in r o the section engineer ( electrical ) public works mla

Read more
A)changing of damaged poles and conductors of 440v o/h line in muraidih new colony and (b) changing of damaged poles and conductors of 440v o/h line and other electrical works in khodovelly bahaldih basti under muraidih,amp colliery, barora area.

A)changing of damaged poles and conductors of 440v o/h line in muraidih new colony and (b) changing of damaged poles and conductors of 440v o/h line and other electrical works in khodovelly bahaldih basti under muraidih,amp colliery, barora area.

Read more
General construction of new building for pharmacy store pharmacy er amp epidemic ward in institute of child health medical college kottayam phase i general electrical work additional works of basement floor

General construction of new building for pharmacy store pharmacy er amp epidemic ward in institute of child health medical college kottayam phase i general electrical work additional works of basement floor

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise