Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Improvement Of Passage And Drainge At Building No. 92, 8th Lane, Kamathipura In Beat No. 213 In E Ward
|
Description |
Improvement Of Passage And Drainge At Building No. 92, 8th Lane, Kamathipura In Beat No. 213 In E Ward
|
Organisation | Municipal Corporation of Greater Mumbai | State Govt. and UT |
Tender Id | 2025_MCGM_1196499_1 |
Reference Number |
MDB/2116 |
Tender Fee | 2214 |
EMD | 5800 |
Tender Value | |
Place | E WARD |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2072736 |
Start Date | July 02, 2025 23:30 |
End Date |
08/07/2025 ( Expired 7 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Read moreWidening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreRfp for work of improvement and up-gradation to four lane with paved shoulder configuration from design km. 40.000 (kodarkoot) to design km. 66.375 (bela chowk) of nh-91a in the state of uttar pradesh on hybrid annuity model (ham) basis.
Rfp for work of improvement and up-gradation to four lane with paved shoulder configuration from design km. 40.000 (kodarkoot) to design km. 66.375 (bela chowk) of nh-91a in the state of uttar pradesh on hybrid annuity model (ham) basis.
Read moreConsultancy services for preparation of detailed project report for construction of 02 lane bridges at km 171.056, km 178.612, km 192.354, km 194.118, km 201.176, km 216.801 and km 226.195 of nh730 in the state of uttar pradesh.
Consultancy services for preparation of detailed project report for construction of 02 lane bridges at km 171.056, km 178.612, km 192.354, km 194.118, km 201.176, km 216.801 and km 226.195 of nh730 in the state of uttar pradesh.
Read moreConsultancy services for preparation of detailed project report for construction of 02 lane bridges at km 92.911, km 99.206, km 100.600, km 121.800, km 126.901, km 144.135 and km 150.794 of nh-730 in the state of uttar pradesh.
Consultancy services for preparation of detailed project report for construction of 02 lane bridges at km 92.911, km 99.206, km 100.600, km 121.800, km 126.901, km 144.135 and km 150.794 of nh-730 in the state of uttar pradesh.
Read moreUpgradation of construction of six lane highway corridor from ch. 8/500 to 33/500 and upgradation of existing highway to six lanes from ch. 8/500 to 40/00 section at grade section of hadapsar yevat (nh-65) in the state of maharashtra
Upgradation of construction of six lane highway corridor &#x0d from ch. 8/500 to 33/500 and upgradation of existing &#x0d highway to six lanes from ch. 8/500 to 40/00 section at&#x0d grade section of hadapsar yevat (nh-65) in the state of &#x0d maharashtra
Read moreConstruction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreof your Industry type