Tender Details
Particulars | Details |
---|---|
Title |
Maintenance Of Already Transplanted Plants From Small P Bags To Large P Bags In Patiala Ki Rao Beat Nursery In Chandigarh Range
|
Description |
Maintenance Of Already Transplanted Plants From Small P Bags To Large P Bags In Patiala Ki Rao Beat Nursery In Chandigarh Range
|
Organisation | Chandigarh Administration | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 10500 |
Tender Value | |
Place | Chandigarh |
Link |
AAAAAAAAAA Login to view |
Start Date | April 17, 2025 23:30 |
End Date |
06/05/2025 ( 16 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Performance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p
Performance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p
Read morePerformance based maintenance contracts pbmc estimate of katol to warud section of nh- 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance period
Performance based maintenance contracts pbmc estimate of katol to warud section of nh_ 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance per
Read moreOperation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Read morePerformance based maintenance contract cost estimate from km. 92.025 to km 158.060 of nh-76 in the state of uttar pradesh
Performance based maintenance contract cost estimate from km. 92.025 to km 158.060 of nh-76 in the state of uttar pradesh
Read moreIndependent engineer services for development, operations and maintenance of ropeway from sonprayag to kedarnath in the state of uttarakhand on dbfot mode
Independent engineer services for development, operations and maintenance of ropeway from sonprayag to kedarnath in the state of uttarakhand on dbfot mode
Read moreIndependent engineer services during operation and maintenance of six-laning of nh-71 from renigunta (km. 0.000) to naidupeta (km.57.046) (length-57.046 km.) on hybrid annuity mode in the state of andhra pradesh under bharatmala pariyojana.
Independent engineer services during operation and maintenance of six-laning of nh-71 from renigunta (km. 0.000) to naidupeta (km.57.046) (length-57.046 km.) on hybrid annuity mode in the state of andhra pradesh under bharatmala pariyojana.
Read moreShort term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Short term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Read moreAnnual maintenance and incident management of gozaria-prantij section from km 558.200 to km 595.585 on nh-68 in the state of gujarat.
Annual maintenance and incident management of gozaria-prantij section from km 558.200 to km 595.585 on nh-68 in the state of gujarat.
Read morePerformance based maintenance contract (pbmc) estimate from km. 59/000 to 59/921 , 0/000 to 1/600 (temple link) of nh- 316 badadanda, puri and from km. 59/921 to 90/200 (puri-konark link) and from km. 0/000 to 28/500 (puri-satapada link) in odisha
Performance based maintenance contract (pbmc) estimate from km. 59/000 to 59/921 , 0/000 to 1/600 (temple link) of nh- 316 badadanda, puri and from km. 59/921 to 90/200 (puri-konark link) and from km. 0/000 to 28/500 (puri-satapada link) in odisha
Read moreRoutine maintenance including incident management for operation and maintenance of hyderabad-bangalore section-3 from km 377.000 to km 462.164 of nh 44 (total length 85.164 km) in the state of andhra pradesh
Routine maintenance including incident management for operation and maintenance of hyderabad-bangalore section-3 from km 377.000 to km 462.164 of nh 44 (total length 85.164 km) in the state of andhra pradesh
Read moreof your Industry type