Tender Details

Particulars Details
Title
Complete Maintenance Of Raw Material Station, S/Curve, Oh Station & Pm Post Rly Track.
Description
Complete Maintenance Of Raw Material Station, S/Curve, Oh Station & Pm Post Rly Track.
Organisation Steel Authority of India Ltd | Public Sector Undertakings
Tender Id 101033
Reference
Number
RFx No: 8000046098
Tender Fee 0
EMD 0
Tender Value -
Place Bhilai Steel Plant
Link
View Original Tender Notice

https://sailtenders.co.in/Home/TendDetails?hTend=101033

Start Date March 11, 2025 18:30
End Date
Expired 20/03/2025

Expired 576 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Pump complete 40 k raw wa 45k 18 m3/hr

Pump complete 40 k raw wa 45k 18 m3/hr

Read more
Complete tr probe tool post assembly with fittings

Complete tr probe tool post assembly with fittings

Read more
Complete bowl assly. hvac make up pump,complete bowl assembly, potable water,complete bowl assembly, ash water pump,complete bowl assembly for raw water pump

Complete bowl assly. hvac make up pump,complete bowl assembly, potable water,complete bowl assembly, ash water pump,complete bowl assembly for raw water pump

Read more
14705 - dowel pin- para post, serrated, complete kit refills, 50 pin each of diameter

14705 - dowel pin- para post, serrated, complete kit refills, 50 pin each of diameter

Read more
Complete manufacture of silencer, suction hood, roof with lug- all including trail assembly and packing with vendors own raw material

Complete manufacture of silencer, suction hood, roof with lug- all including trail assembly and packing with vendors own raw material

Read more
Pre & post tamping track measurements using portable track geometry measurement trolley system similar to trimble gedo vorsys trolley system for design mode tamping on all lines under the jurisdiction of sr.den/north/nagpur.

Pre & post tamping track measurements using portable track geometry measurement trolley system similar to trimble gedo vorsys trolley system for design mode tamping on all lines under the jurisdiction of sr.den/north/nagpur.

Read more
Supplying, stacking and loading of 65mm machine crushed hard and durable track stone ballast as per rly s specification for track ballast is/rdso-ge/0001:2023 including all lead, lift, taxes, royalties, duties etc. at beohari depot under assistant divisional engineer beohari sub division

Supplying, stacking and loading of 65mm machine crushed hard and durable track stone ballast as per rly s specification for track ballast is/rdso-ge/0001:2023 including all lead, lift, taxes, royalties, duties etc. at beohari depot under assistant divisional engineer beohari sub division

Read more
Supplying, stacking and loading of 65mm machine crushed hard and durable track stone ballast as per rly s specification for track ballast is/rdso-ge/0001:2023 including all lead, lift, taxes, royalties, duties etc. at damoh depot under assistant divisional engineer damoh sub division

Supplying, stacking and loading of 65mm machine crushed hard and durable track stone ballast as per rly s specification for track ballast is/rdso-ge/0001:2023 including all lead, lift, taxes, royalties, duties etc. at damoh depot under assistant divisional engineer damoh sub division

Read more
Supplying, stacking and loading of 65mm machine crushed hard and durable track stone ballast as per rly s specification for track ballast is/rdso-ge/0001:2023 including all lead, lift, taxes, royalties, duties etc. at beohari depot under assistant divisional engineer beohari sub division

Supplying, stacking and loading of 65mm machine crushed hard and durable track stone ballast as per rly s specification for track ballast is/rdso-ge/0001:2023 including all lead, lift, taxes, royalties, duties etc. at beohari depot under assistant divisional engineer beohari sub division

Read more
Complete track renewal (p) 60 kg = 31.475 tkm and through sleeper renewal(p)=11.444 tkm. total=43.019 tkm by using any track laying equipment (tle) in sdah division of eastern railway

Complete track renewal (p) 60 kg = 31.475 tkm and through sleeper renewal(p)=11.444 tkm. total=43.019 tkm by using any track laying equipment (tle) in sdah division of eastern railway

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise