Tender Details

About Tender

🏭 Invitation For Bids: Groundwater Augmentation Project 💧 The Department Of Water Resources, State Govt. And Ut, Invites Bids For The Construction Of A Recharge Scheme Aimed At Augmenting The Groundwater Table By Artificial Recharging Using Canal Water In The Chheharta Section Of The Majitha Canal And The Round Water Division In Amritsar. 📅 Bid Submission Deadline: June 03, 2024, 12:00 Pm Tender Fee: Inr 1496 Emd: Inr 16880 Interested Bidders Should Possess The Necessary Expertise In Water Resource Management And Civil Construction Projects. Proposals Must Include Detailed Project Plans, Cost Estimates, And Timelines For Completion, Adhering To The Specifications Outlined In The Tender Document. Keywords: Construction, Groundwater Augmentation, Water Resources, Artificial Recharge, Majitha Canal, Amritsar, Tender, Bid, Government Contract
Particulars Details
Title
Construction Of Recharge Scheme Of Augment Ground Water Table By Artificial Recharging To Ground Ater Table By Canal Water In Chheharta Section Of Majitha Canal And Round Water Division Amritsar
Description
Construction Of Recharge Scheme Of Augment Ground Water Table By Artificial Recharging To Ground Ater Table By Canal Water In Chheharta Section Of Majitha Canal And Round Water Division Amritsar
Organisation Department of Water Resources | State Govt. and UT
Tender Id 2024_WR_121562_1
Reference
Number
E-Tender Notice24
Tender Fee 1496
EMD 16880
Tender Value
Place Xen Majitha Pimti Complex Asr
Link https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=249338
Start Date June 14, 2024 14:40
End Date

21/06/2024 ( Expired 368 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Read more
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Construction of fob at km 382.510 and construction of service road from km.410/680 to km 411.260 along with new minor bridge on bhs in dindigul to samayanallaur section of nh-44 in the state of tamil nadu on item rate basis (3rd call)

Construction of fob at km 382.510 and construction of service road from km.410/680 to km 411.260 along with new minor bridge on bhs in dindigul to samayanallaur section of nh-44 in the state of tamil nadu on item rate basis (3rd call)

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Execution of slope protection work with construction of retaining wall work in km 155.240 to km 155.400 and 155.500 to 155.840, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 (new nh-66) to

Execution of slope protection work with construction of retaining wall work in km 155.240 to km 155.400 and 155.500 to 155.840, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 (new nh-66) to

Read more
Construction of foot over bridge at km 27.005 (kandamangalam near govt. school) and km 28.885 (navamal kapper) on viluppuram to puducherry section of nh 332 (old nh 45a) in the state of tamil nadu and puducherry (ut)

Construction of foot over bridge at km 27.005 (kandamangalam near govt. school) and km 28.885 (navamal kapper) on viluppuram to puducherry section of nh 332 (old nh 45a) in the state of tamil nadu and puducherry (ut)

Read more
Canal water based water supply project for construction of 5.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 at dirba, district sangrur, punjab under amrut 2.0 scheme

Canal water based water supply project for construction of 5.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 at dirba, district sangrur, punjab under amrut 2.0 scheme

Read more
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode

Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise