Tender Details
Particulars | Details |
---|---|
Title |
(A)carrying Out Structural Stability And Ndt Test Of Surface Bunker Installed In Jhilimili Mine (B)carrying Out Structural Stability Test Of Surface Bunker At Katkona 1 N2 Incline (C)ndt Of Man Riding System Phase I And Phase Ii At Katkona 1 N2 Incline
|
Description |
(A)carrying Out Structural Stability And Ndt Test Of Surface Bunker Installed In Jhilimili Mine (B)carrying Out Structural Stability Test Of Surface Bunker At Katkona 1 N2 Incline (C)ndt Of Man Riding System Phase I And Phase Ii At Katkona 1 N2 Incline
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_SECL_323945_1 |
Reference Number |
SECL/GM/BKP/ENM/eTender/24-25/ 25 |
Tender Fee | 0 |
EMD | 14300 |
Tender Value | |
Place | Baikunthpur |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=335797 |
Start Date | December 24, 2024 22:30 |
End Date |
06/01/2025 ( Expired 104 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
(a). repairing of 2000gpm, 150 mtrs. head, make-flowmore model horizontal, sl.no- 17042951 installed at gvp phase-ii ocp (b). repairing of rkb 250, 200 mtrs. head 2000 gpm, sl.no.-12972150004 make-kirlosker pump of gvp phase-ii ocp, (c). repairing wo
(a). repairing of 2000gpm, 150 mtrs. head, make-flowmore model horizontal, sl.no- 17042951 installed at gvp phase-ii ocp (b). repairing of rkb 250, 200 mtrs. head 2000 gpm, sl.no.-12972150004 make-kirlosker pump of gvp phase-ii ocp, (c). repairing wo
Read more1.replacement of 1000 mm pony drive head of 38l belt and discharge base of 22l and 3dip 2nd belt for jhilimili mine.2.renovation/repairing of surface belt discharge frame, chute, surface belt structure supporting column at katkona 1n2 incline.
1.replacement of 1000 mm pony drive head of 38l belt and discharge base of 22l and 3dip 2nd belt for jhilimili mine.2.renovation/repairing of surface belt discharge frame, chute, surface belt structure supporting column at katkona 1n2 incline.
Read more1.providing and fixing of ngr in gec, andrew yule and brentford make transformer in katkona 1n2 incline 2.providing and fixing of ngr in 02 nos andrew yule and 01 no. gec make tsu installed at pandavpara mine
1.providing and fixing of ngr in gec, andrew yule and brentford make transformer in katkona 1n2 incline 2.providing and fixing of ngr in 02 nos andrew yule and 01 no. gec make tsu installed at pandavpara mine
Read moreSp.124 nctps ii es circle c i division fsss sub division unit i and ii sg fsss system carrying out running maintenance works of c i equipment in unit i and ii sg fsss system and allied areas for the period up to 31st march 2026 from the date
Sp.124 nctps ii es circle c i division fsss sub division unit i and ii sg fsss system carrying out running maintenance works of c i equipment in unit i and ii sg fsss system and allied areas for the period up to 31st march 2026 from the date
Read moreSp.128 nctps ii es circle ci division lab subdivision unit i and ii lab system and allied areas carrying out maintenance works of c i equipment s for the period up to 31 march 2026 from the date of taking over of site
Sp.128 nctps ii es circle ci division lab subdivision unit i and ii lab system and allied areas carrying out maintenance works of c i equipment s for the period up to 31 march 2026 from the date of taking over of site
Read moreSp.126 nctps ii es circle c i division unit i bop i max dna system and allied areas carrying out maintenance activities of c i equipment for the period up to 31st march 2026 from the date of taking over of site.
Sp.126 nctps ii es circle c i division unit i bop i max dna system and allied areas carrying out maintenance activities of c i equipment for the period up to 31st march 2026 from the date of taking over of site.
Read moreSp.127 nctps ii es circle c i division unit ii bop ii max dna system and allied areas carrying out maintenance activities of c i equipment for the period up to 31st march 2026 from the date of taking over of site
Sp.127 nctps ii es circle c i division unit ii bop ii max dna system and allied areas carrying out maintenance activities of c i equipment for the period up to 31st march 2026 from the date of taking over of site
Read moreCarrying out various works for shielding, covering a type, b type, c type lt panels and insulation tapping on st pole at various places in the area of eudd i, mathura under the jurisdiction of se, eudc, mathura
Carrying out various works for shielding, covering a type, b type, c type lt panels and insulation tapping on st pole at various places in the area of eudd i, mathura under the jurisdiction of se, eudc, mathura
Read moreCarrying out various works for shielding, covering a type, b type, c type lt panels and insulation tapping on st pole at various places in the area of eudd ii, mathura under the jurisdiction of se, eudc, mathura
Carrying out various works for shielding, covering a type, b type, c type lt panels and insulation tapping on st pole at various places in the area of eudd ii, mathura under the jurisdiction of se, eudc, mathura
Read moreConsultancy services for carrying out the non destructive test ndt for assessment of stability of structural health of existing 2 nos. abutment of the collapsed bailey bridge at kimious village, car nicobar under sd-iv, cd, apwd, car nicobar, a and
Consultancy services for carrying out the non destructive test ndt for assessment of stability of structural health of existing 2 nos. abutment of the collapsed bailey bridge at kimious village, car nicobar under sd-iv, cd, apwd, car nicobar, a and
Read moreof your Industry type