Tender Details
About Tender
🛣️ Invitation For Bids: Manthala Rachwana Culvert Construction 🪨🏗️ The Public Works Department (Pwd), State Govt. And Ut, Ee Mandi Division No Ii, Hppwd Mandi, Invites Bids For The Construction Of A 3.00 Mtr. Span Slab Culvert With Both Side Wing Walls At Rd. 2/510 Under The State Component Of Special Central Assistance (Scsp) Scheme. 📅 Bid Submission Deadline: July 12, 2024, 11:00 Am Tender Fee: Inr 350 Earnest Money Deposit (Emd): Inr 27,100 Interested Contractors Must Review The Detailed Project Specifications And Submit Their Bids In Accordance With The Tender Documents And Guidelines. Keywords: Pwd, Culvert Construction, State Govt. And Ut, Scsp, Bid, Emd, Tender, Infrastructure DevelopmentParticulars | Details |
---|---|
Title |
Restoration Of Rain Damages On Circuit House Mandi Sanyardi Road Km. 0/000 To 1/600.
|
Description |
Construction Of Breast Wall At R.D. 0/139 To 0/152) Above 8 Ft. (2.44 )Mtr. Height.
|
Organisation | PWD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 350 |
EMD | 3800 |
Tender Value | |
Place | EE MANDI DIVISION NO-II HPPWD MANDI |
Link |
AAAAAAAAAA Login to view |
Start Date | June 02, 2025 23:30 |
End Date |
10/06/2025 ( 2 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreConsultancy services for authoritys engineer for supervision of construction of road from huri taliha section of frontier highway nh 913 huri parsi palo km 0.00 to 55.725 55.725 km
Consultancy services for authoritys engineer for supervision of construction of road from huri taliha section of frontier highway nh 913 huri parsi palo km 0.00 to 55.725 55.725 km
Read moreConsultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh-913 bameng khenewa 43 65 to 85 60 41 950 km
Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh-913 bameng khenewa 43 65 to 85 60 41 950 km
Read moreConsultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh-913 lada to bameng 0 000 to 43 65 43 65 km
Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh-913 lada to bameng 0 000 to 43 65 43 65 km
Read moreof your Industry type