Tender Details
Particulars | Details |
---|---|
Title |
Civil Construction Work
|
Description |
Civil Construction Work
|
Organisation | Directorate of Local Bos UP | State Govt. and UT |
Tender Id | 2025_DOLBU_1031864_1 |
Reference Number |
16/15VA/NPA/EN/2025-26(9) |
Tender Fee | 236 |
EMD | 18100 |
Tender Value | |
Place | NAGAR PANCHAYAT AMETHI LUCKNOW |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1866739 |
Start Date | April 23, 2025 22:30 |
End Date |
17/05/2025 ( Expired 15 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreDetailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreCompletion of incomplete work of provn of 01 mw solar power plant work at vadodara
Completion of incomplete work of provn of 01 mw solar power plant work at vadodara
Read moreFleet base buildings landside works (fbl)
Fleet base buildings landside works
 (fbl) - construction of fleet base
 buildings and infrastructure,
 equipment supply, installation,
 commissioning, operation and
 maintenance of landside facilities
 at naval base, karwar, karnataka
Read morePackage iii civil works of water conductor system and power house complex of tato ii hydro electric project
Package iii civil works of power intake, head race tunnel, surge shaft, valve chamber, pressure shafts and penstock, underground powerhouse complex (comprising of powerhouse cavern, transformer - gis cavern, etc. of tato ii hep
Read moreConstr of bow string steel arch major bridge
Rfp for construction of bow string steel arch major bridge (2nos) across river iravanjippuzha in the
 kozhikode district of kerala state anakkampoyil kalladi meppadi package i
Read moreSelection of epc contractor for chitrakoot link expressway
Development of access controlled greenfield 4 lane (expandable to 6 lane) chitrakoot link expressway in the state of uttar pradesh on engineering, procurement and construction (epc) mode
Read moreof your Industry type