Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Maintenance Of S.W.S.P. Urgent Reinstating The Damaged Service Road Of 1422 Mm Dia Pipeline Washed Out Due To Heavy Rains Between Ch.12750 M To Ch.13851.L2
|
| Description |
Maintenance Of S.W.S.P. Urgent Reinstating The Damaged Service Road Of 1422 Mm Dia Pipeline Washed Out Due To Heavy Rains Between Ch.12750 M To Ch.13851.L2
|
| Organisation | Government of Goa |
| Tender Id | 2023_PWD_11327_1 |
|
Reference Number |
48-1/PWD-WD XII-ASW/2023-24/06L2 |
| Tender Fee | 3000 |
| EMD | 39377 |
| Tender Value | - |
| Place | Executive Engineer PWD WD XII Sanguem-Goa |
| Link |
View Original Tender Notice
https://eprocure.goa.gov.in |
| Start Date | September 14, 2023 23:30 |
| End Date |
Expired
21/09/2023
Expired 1082 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Urgent strengthening of the service road along the 1422 mm dia m.s pipeline damaged due to the torrential rains between ch.12600m to 13060m at ambaulim, quepem.
Urgent strengthening of the service road along the 1422 mm dia m.s pipeline damaged due to the torrential rains between ch.12600m to 13060m at ambaulim, quepem.
Read moreConstruction of the service road along the 1422 mm dia m.s pipeline damaged due to the torrential rains between ch.13080m to 13500m at paroda hills.
Construction of the service road along the 1422 mm dia m.s pipeline damaged due to the torrential rains between ch.13080m to 13500m at paroda hills.
Read moreMaint of swsp- urgent restrengthening of overburden and protection to exposed 1400 mm dia ms pipeline due to wash out during rains between ch.8335 mtrs to 8684 mts.l1
Maint of swsp- urgent restrengthening of overburden and protection to exposed 1400 mm dia ms pipeline due to wash out during rains between ch.8335 mtrs to 8684 mts.l1
Read moreRestoration of katali malhar road km 5th washed due to heavy rains in the month of july august
Please refer in boq
Read moreRestoration of katali malhar road km 5th washed due to heavy rains in the month of july august
Please refer in boq
Read moreUrgent repairing of collapsed compound wall due to rains at central store and workshop premises at cws tadali
Urgent repairing of collapsed compound wall due to rains at central store and workshop premises at cws tadali
Read morePvip -urgent desiltation of inchakandam m d between ch. 3.000km and ch.3.370km
Pvip -urgent desiltation of inchakandam m d
Read moreConstruction of the service road along the 1400 dia m.s pipeline damaged due to the torrential rains between chainage 3850m to 4305m.
Construction of the service road along the 1400 dia m.s pipeline damaged due to the torrential rains between chainage 3850m to 4305m.
Read moreUrgent repair work in sinta minor and in lmc between ch 55 to 85
Urgent repair work in sinta minor and in lmc between ch 55 to 85
Read moreConstruction of 80m long gravity retaining wall for landslide portion due to heavy rains on right side of mundgod-anashi road (sh-46) between ch.113.50 km to 113.70km in joida taluk, uttara kannada district.
Construction of 80m long gravity retaining wall for landslide portion due to heavy rains on right side of mundgod-anashi road (sh-46) between ch.113.50 km to 113.70km in joida taluk, uttara kannada district.
Read moreof your Industry type