Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Maintenance Of S.W.S.P. Urgent Reinstating The Damaged Service Road Of 1422 Mm Dia Pipeline Washed Out Due To Heavy Rains Between Ch.12750 M To Ch.13851.L2
|
Description |
Maintenance Of S.W.S.P. Urgent Reinstating The Damaged Service Road Of 1422 Mm Dia Pipeline Washed Out Due To Heavy Rains Between Ch.12750 M To Ch.13851.L2
|
Organisation | Government of Goa |
Tender Id | 2023_PWD_11327_1 |
Reference Number |
48-1/PWD-WD XII-ASW/2023-24/06L2 |
Tender Fee | 3000 |
EMD | 39377 |
Tender Value | |
Place | Executive Engineer PWD WD XII Sanguem-Goa |
Link | https://eprocure.goa.gov.in |
Start Date | September 14, 2023 23:30 |
End Date |
21/09/2023 ( Expired 650 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repair and maintenance of damaged roof sheets due to heavy storm at kathara washery plant under kathara area
Repair and maintenance of damaged roof sheets due to heavy storm at kathara washery plant under kathara area
Read moreAAAAAAAAAA
Login to viewLauhati-ghatakpukur road from 12.495 km to 15.20 km, bhangar bazar kulti canal road from 0.00 kmp to 2.41 km, permanent restoration work in different stretches damaged due to laying of gas pipeline by hpcl city gas distribution project in wb.
Read moreRepairing , maintenance and supply pipeline materials which include ci,di,gi,ac,pvc 15 mm dia to 500 mm dia with necessary fittings for repairing and maintenance of water supply distribution pipeline under borough iii under amc.
Repairing ,&#x0d maintenance and&#x0d supply pipeline&#x0d materials which&#x0d include&#x0d ci,di,gi,ac,pvc&#x0d 15 mm dia to 500&#x0d mm dia with&#x0d necessary fittings for&#x0d repairing and&#x0d maintenance of&#x0d water supply&#x0d distribution pipeline&#x0d under borough iii&#x0d under amc.
Read moreReconstruction of khala (abhi ka khala) on badripur jamniwala parduni at link road damaged due to heavy monsoon km. 0/0 to 15/0. (sh- re-construction of rcc box cell bridge at rd. 7/915).
Reconstruction of khala (abhi ka khala) on badripur jamniwala parduni at link road damaged due to heavy monsoon km. 0/0 to 15/0. (sh- re-construction of rcc box cell bridge at rd. 7/915).
Read moreQuantum of works involved in maintenance and replacement of 33 kv, 11 kv and l.t. line which are damaged due to acciedent of vehicle, theft of wire and heavy storm (daiviya aapda) etc. under the area of edsd-ii under the edd-pd nagar unnao.
Quantum of works involved in maintenance and replacement of 33 kv, 11 kv and l.t. line which are damaged due to acciedent of vehicle, theft of wire and heavy storm (daiviya aapda) etc. under the area of edsd-ii under the edd-pd nagar unnao.
Read moreQuantum of works involved in maintenance and replacement of 33 kv, 11 kv and l.t. line which are damaged due to acciedent of vehicle, theft of wire and heavy storm (daiviya aapda) etc. under the area of edsd-i and iii under the edd-pd nagar unnao.
Quantum of works involved in maintenance and replacement of 33 kv, 11 kv and l.t. line which are damaged due to acciedent of vehicle, theft of wire and heavy storm (daiviya aapda) etc. under the area of edsd-i and iii under the edd-pd nagar unnao.
Read moreProviding, lowering, laying and jointing of 200 mm dia and 150 mm dia d.i. pipeline from milind nagar bajpai cross road to lake castle society area, gauripada road, kalyan west. (8th call)
Providing, lowering, laying and jointing of 200 mm dia and 150 mm dia d.i. pipeline from milind nagar bajpai cross road to lake castle society area, gauripada road, kalyan west. (8th call)
Read moreRepair of damaged road portion (due to laying of underground iph pipeline)on dharampur kasauli (mdr-10) road in km. 0/00 to 10/850
Repair of damaged road portion (due to laying of underground iph pipeline)on dharampur kasauli (mdr-10) road in km. 0/00 to 10/850.(sh loosening levelling p/l gsb wmm, 50mm thick bm, 30mm thick bc, c/o v-shape drain and parapets etc. in km. 7/465 t
Read moreRepairing of pipe line used for supply of water from 6 pit bararee to 1 no. colony and bazar dhowra under bararee section total section of pipeline to be repaired damaged and worn out pipe is 120 mrt 4 inch dia m.s. pipe and changing/replace 4 in
Repairing of pipe line used for supply of water from 6 pit bararee to 1 no. colony and bazar dhowra under bararee section total section of pipeline to be repaired damaged and worn out pipe is 120 mrt 4 inch dia m.s. pipe and changing/replace 4 in
Read moreRepairing and maintenance work of sukna birupur road from ch 0.00 to ch 2500 in stretches by repairing potholes , 20 mm pc and sc type b under birbhum division, p.w.dte during the year 2025 26
Repairing and maintenance work of sukna birupur road from ch 0.00 to ch 2500 in stretches by repairing potholes , 20 mm pc and sc type b under birbhum division, p.w.dte during the year 2025 26
Read moreof your Industry type