Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Mill Plant Unit Ii Overhauling Load Testing And Certifying Of Lifting Tools And Movable Trolleys
|
| Description |
Mtps I Mill Plant Unit Ii Overhauling Load Testing And Certifying Of Lifting Tools And Movable Trolleys
|
| Organisation | TNEB Limited | TANGEDCO | CE-MTPS-I - TANGEDCO | SE-Mechanical Maintenance I-MTPS-I - TANGEDCO |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | 1600 |
| Tender Value | - |
| Place | Tamil Nadu |
| Link | Login to view |
| Start Date | October 07, 2026 14:30 |
| End Date |
Open
21/10/2026
8 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Um/stat/qtn/001/26-27 statutory load testing and certification of cranes, lifting tools and tackles, and pressure vessels
Statutory load testing and certification of cranes, lifting tools and tackles, and pressure vessels
Read moreMtps i mill plant unit ii overhauling of gravimetric feeders and clean out conveyor of mill 2a to 2f during aoh 2026 2027
Mtps i mill plant unit ii overhauling of gravimetric feeders and clean out conveyor of mill 2a to 2f during aoh 2026 2027
Read moreMtps i m i circle ca rws fwph overhauling of 2 nos of 7.5 ton and 1no of 5 ton capacity crane available at fire water pump house area and load testing of all the cranes etc
Mtps i m i circle ca rws fwph overhauling of 2 nos of 7.5 ton and 1no of 5 ton capacity crane available at fire water pump house area and load testing of all the cranes etc
Read moreMtps i mill plant unit ii overhauling of tramp iron chute knife edge gate valves strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills renewal of the worn out mill
Mtps i mill plant unit ii overhauling of tramp iron chute knife edge gate valves strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills renewal of the worn out mill
Read moreMtps i mill plant unit ii overhauling of classifier assemblies replacement repairing of eroded inner cone inner cone drum section venture vanes venturi collars during aoh 2026 27
Mtps i mill plant unit ii overhauling of classifier assemblies replacement repairing of eroded inner cone inner cone drum section venture vanes venturi collars during aoh 2026 27
Read moreRepair and overhauling service - rate contract for repair overhauling and load testing of hydraulic operated torpedo loading trolley onboard in vessels any other suitable brand no buyer premises
Repair and overhauling service - rate contract for repair overhauling and load testing of hydraulic operated torpedo loading trolley onboard in vessels any other suitable brand no buyer premises
Read moreMtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreInsitu five yearly servicing of lifeboats inspection testing overhauling and certification launching appliances and on load release gear installed at offshore installations of ongc
Insitu five yearly servicing of lifeboats inspection testing overhauling and certification launching appliances and on load release gear installed at offshore installations of ongc
Read moreEchp-i-overhauling load testing of 7.5 t, 5 t 2 t capacity chain block at conveyor 43, 46, bfd 9a, 9b and reject conveyor-1 at pch-i
Echp-i-overhauling load testing of 7.5 t, 5 t 2 t capacity chain block at conveyor 43, 46, bfd 9a, 9b and reject conveyor-1 at pch-i
Read moreMtps i tm i unit ii inspection and overhauling of oil vapour extraction fan assembly cleaning hydraulic testing of turbine lube oil cooler seal oil cooler overhauling of nrv gate valve cleaning of strainer assembly and cooling water lines of esv iv
Mtps i tm i unit ii inspection and overhauling of oil vapour extraction fan assembly cleaning hydraulic testing of turbine lube oil cooler seal oil cooler overhauling of nrv gate valve cleaning of strainer assembly and cooling water lines of esv iv
Read moreof your Industry type