Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Surface Improvement Work By Bc From Km 12 To 18 (Diversion From Mussoorie Road) In Dehradun Mussoorie Road (Sh 1) Under Global Investor Summit 2023. (Package 4)
|
Description |
Surface Improvement Work By Bc From Km 12 To 18 (Diversion From Mussoorie Road) In Dehradun Mussoorie Road (Sh 1) Under Global Investor Summit 2023. (Package 4)
|
Organisation | Government of Uttarkhand |
Tender Id | 2023_pwd_62709_1 |
Reference Number |
5873/1C-9/23, Dated 26.08.2023 |
Tender Fee | 5900 |
EMD | 5.02 Lakh |
Tender Value | |
Place | Superintending Engineer, 9th Circle, PWD, Dehradun |
Link | https://uktenders.gov.in |
Start Date | September 06, 2023 20:30 |
End Date |
23/09/2023 ( Expired 634 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh
Maintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh
Read moreImprovement and bituminous work on tugdunda-bhaiswara motor road (km 0.000 to 5.000) in pauri constituency of pauri gharwal district under state sector
Improvement and bituminous work on tugdunda-bhaiswara motor road (km 0.000 to 5.000) in pauri constituency of pauri gharwal district under state sector
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreConstruction of road from main road mandi phagla buffliaz km 7th to peer fazal shah ziyarat via mohalla kumarah surankote part 1st by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick w
Construction of road from main road mandi phagla buffliaz km 7th to peer fazal shah ziyarat via mohalla kumarah surankote part 1st by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick w
Read moreMaintenance work from km 34/560 to km 36/000 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh
Maintenance work from km 34/560 to km 36/000 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh
Read moreStrengthening work by dbm bc in marchula sarikhet bajro pokhda stpuli pauri motor road sh 32 in km 41 to 75.500 in almora district under central road and infrastructure fund crif
Strengthening work by dbm bc in marchula sarikhet bajro pokhda stpuli pauri motor road sh 32 in km 41 to 75.500 in almora district under central road and infrastructure fund crif
Read moreDalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreSurface improvement and road safety work under crif from km 75.50 to 143.40 of state highway no. 32 of late shri geetaram pokhriyal motor road (marchula- saraikhet- baijro- pokhda- satpuli- pauri motor road).
Surface improvement and road safety work under crif from km 75.50 to 143.40 of state highway no. 32 of late shri geetaram pokhriyal motor road (marchula- saraikhet- baijro- pokhda- satpuli- pauri motor road).
Read moreBalance work of road from jabri to mohalla bajjarana via pyt bachanwali tehsil surankote district poonch km 1st rd 0 to km 2nd rd 1000 by way of earth work in cutting cross drinage.walling providing and laying 150mm thick wbm grade-ii,75mm thick gr
Balance work of road from jabri to mohalla bajjarana via pyt bachanwali tehsil surankote district poonch km 1st rd 0 to km 2nd rd 1000 by way of earth work in cutting cross drinage.walling providing and laying 150mm thick wbm grade-ii,75mm thick gr
Read moreof your Industry type