Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Removal Of Dust And Spillage Material, Maintaining Bunker Volume And Emptying Of Recyclable Bunkers In Sp2.
|
| Description |
Removal Of Dust And Spillage Material, Maintaining Bunker Volume And Emptying Of Recyclable Bunkers In Sp2.
|
| Organisation | Steel Authority of India Ltd | Public Sector Undertakings |
| Tender Id | 103510 |
|
Reference Number |
111/RCD/CPWD/2024-25 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Bhilai Steel Plant |
| Link |
View Original Tender Notice
https://sailtenders.co.in/Home/TendDetails?hTend=103510 |
| Start Date | November 14, 2025 16:30 |
| End Date |
Expired
28/11/2025
Expired 317 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Custom bid for services - removal by digging of the set spillage and loose powdered spillage dust i
Read more
Emptying and cleaning of coal bunkers by water jet of fire hose pipe, for visual inspection of coal bunkers for repair / maintenance including removal of coal slurry from feeder floors, transportation of freshly removal coal from 0 meter level
Emptying and cleaning of coal bunkers by water jet of fire hose pipe, for visual inspection of coal bunkers for repair / maintenance including removal of coal slurry from feeder floors, transportation of freshly removal coal from 0 meter level
Read moreEmptying and cleaning of coal bunkers by water jet of hose pipe for visual inspection of coal bunker during aoh of unit no.11and during running of unit no.10 at stps sarni
Emptying and cleaning of coal bunkers by water jet of hose pipe for visual inspection of coal bunker during aoh of unit no.11and during running of unit no.10 at stps sarni
Read moreCleaning of aquatic weeds and hyacinth from intake canal, removal of spillage coal from switch gear roof, removal and disposal of debris,coal dust, ash, garbage etc from different areas of dtps plant.
Cleaning of aquatic weeds and hyacinth from intake canal, removal of spillage coal from switch gear roof, removal and disposal of debris,coal dust, ash, garbage etc from different areas of dtps plant.
Read moreRegular cleaning of spillage coal dust/slush/slurry etc including feeder breakers,associated secondary crushers and belt conveyors,steel bunkers etc of all running feeder breaker circuit at mini chp for a period of 180days at dipka expansion project.
Regular cleaning of spillage coal dust/slush/slurry etc including feeder breakers,associated secondary crushers and belt conveyors,steel bunkers etc of all running feeder breaker circuit at mini chp for a period of 180days at dipka expansion project.
Read moreThe work of bunker cleaning and shifting of coal removed from coal bunkers of 5x200mw and round the clock poking for removal of rat hole/choked coal inside raw coal bunkers for smooth coal feeding in rc feeder of unit no. 9, 10, 11, 12and13 of chp, b
The work of bunker cleaning and shifting of coal removed from coal bunkers of 5x200mw and round the clock poking for removal of rat hole/choked coal inside raw coal bunkers for smooth coal feeding in rc feeder of unit no. 9, 10, 11, 12 and 13 of chp
Read moreRemoval of of spillage muck/debris from tc-05 in gwarekh dip and tc-08 belt (6th rise belt from bunker t0 old d-18 bg) for smooth running of the belt conveyor ,xvi(t) seam 400mh moonidih colliery, w.j.area.
Removal of of spillage muck/debris from tc-05 in gwarekh dip and tc-08 belt (6th rise belt from bunker t0 old d-18 bg) for smooth running of the belt conveyor ,xvi(t) seam 400mh moonidih colliery, w.j.area. 
Read moreCleaning of main and sub tranches of conveyor k-10 and k-16 of coal yard of btps, obra and the work of bunker cleaning and shifting of coal removed from coal bunkers of 5x200mw and round the clock poking for removal of rat hole/choked coal inside raw
Cleaning of main and sub tranches of conveyor k-10 and k-16 of coal yard of btps, obra and the work of bunker cleaning and shifting of coal removed from coal bunkers of 5x200mw and round the clock poking for removal of rat hole/choked coal inside raw
Read moreof your Industry type