Tender Details
Particulars | Details |
---|---|
Title |
Proposal For Solar Pump, Solar Street Light And Solar High Mast At Village Andua And Nayabasti Village Under Csr Work Of Btps
|
Description |
Proposal For Solar Pump, Solar Street Light And Solar High Mast At
Village Andua And Nayabasti Village Under Csr Work Of Btps
|
Organisation | Damodar Valley Corporation | Public Sector Undertakings |
Tender Id | 2024_DVC_189480_1 |
Reference Number |
DVC/T/BTPS/ESIIA/CnM/WnS/89 |
Tender Fee | 1000 |
EMD | 39585 |
Tender Value | |
Place | BTPS |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=207366 |
Start Date | March 02, 2024 23:00 |
End Date |
09/03/2024 ( Expired 442 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Selection of epc contractor for integrated manufacturing cluster imc palakkad
Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.
Read moreDesign, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read moreWork servises for provision of infrastructure for
Work servises for provision of infrastructure for
 induction of trainer aircraft at afa under ge(afa) hyderabad.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreSupply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Supply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Read moreHiring the services of one number brand new mahindra bolero b4 with ac, 7 seater, diesel driven bs vi model or equivalent for use in row patrolling of mainline from plkm0.0 to plkm34.0 and branch line from plkm0.0 to plkm38.0 under pump station 1 jurisdiction for a period of 4 years
Hiring the services of one number brand new mahindra bolero b4 with ac, 7 seater, diesel driven bs vi model or equivalent for use in row patrolling of mainline from plkm0.0 to plkm34.0 and branch line from plkm0.0 to plkm38.0 under pump station 1 jurisdiction for a period of 4 years
Read more84145/e8 provn of work services for pol store at af jorhat under ge (af) jorhat
84145/e8 provn of work services for pol store at af jorhat under ge (af) jorhat
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreUrgent repair, maintenance at risk and cost of contractor for rimuli koida section of nh 520 i.e. pkg 1 under nhdp iii in the state of odisha
Urgent repair, maintenance at risk and cost of contractor for rimuli koida section of nh 520 i.e. pkg 1 under nhdp iii in the state of odisha
Read moreof your Industry type