Tender Details

Particulars Details
Title
Viaduct Maintenance
Description
Comprehensive Maintenance Of Viaducts
Organisation Chennai Metro Rail Limited | Central Govt. Ministry/Department
Tender Id 2024_CMRL_838181_1
Reference
Number
2024_CMRL_Viaduct Maintenance
Tender Fee 16000
EMD 4.91 Lakh
Tender Value -
Place Chennai
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=880992

Start Date December 26, 2024 14:30
End Date
Expired 02/01/2025

Expired 655 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of viaduct and elevated stations of gurugram metro rail limited

Construction of viaduct and elevated stations from sector 9 metro station (exclusive) to cyber city metro station (inclusive) of gurugram metro corridor between millennium city centre and cyber city, gurugram, india.

Read more
Maintenance contract for controlling leakage and seepage in underground section including tunnel/viaduct, station building, ancillary building, staff qtrs, depot, rss and other associate buildings and maintenance of drainage system of viaduct of...

Maintenance contract for controlling leakage and seepage in underground section including tunnel/viaduct, station building, ancillary building, staff qtrs, depot, rss and other associate buildings and maintenance of drainage system of viaduct of...

Read more
Part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.

Part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.

Read more
Overlay work at approaches to rail cum road bridge across river ganga at munger ghat near munger from km 0.00(km 74.7 of nh-80) to km 9.394(start point of rail cum road viaduct) and km 0.075(end point of rail cum road viaduct) to km 5.198(km 262.8 of

Overlay work at approaches to rail cum road bridge across river ganga at munger ghat near munger from km 0.00(km 74.7 of nh-80) to km 9.394(start point of rail cum road viaduct) and km 0.075(end point of rail cum road viaduct) to km 5.198(km 262.8 of

Read more
Manufacturing, supplying and fixing of precast rcc cable trough cover slabs at viaduct track level in reach-1 and reach-2 of line-1

Replacing of damaged cable trough cover slabs and manufacturing, supplying and fixing of precast rcc cable trough cover slabs at viaduct track level

Read more
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.

Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.

Read more
Design and construction of elevated viaduct twin tunnel by shield tbm cut and cover tunnel mid ventilation cum emergency egress shaft crosspassages ramps two underground stations bengali chauraha and palasia chauraha including architectural finishing

Design and construction of elevated viaduct twin tunnel by shield tbm cut and cover tunnel mid ventilation cum emergency egress shaft crosspassages ramps two underground stations bengali chauraha and palasia chauraha including architectural finishing

Read more
Dk/dd/cor-of/029 - engagement of detailed design consultant for civil, architectural, and e and m works for the design of elevated viaduct and stations, depots and property development area for delhi-karnal namo bharat corridor.

Dk/dd/cor-of/029 - engagement of detailed design consultant for civil, architectural, and e and m works for the design of elevated viaduct and stations, depots and property development area for delhi-karnal namo bharat corridor.

Read more
Engineering, supply, erection, testing and commissioning of 33 kv power distribution, traction substation, auxiliary substations and 750 v dc third rail traction system for 4 underground metro stations from mominpur (excl.)-esplanade including tunnels and iim station including viaduct from joka (excl.)-iim section of diamond park-joka-esplanade corridor of metro railway, kolkata (west bengal), india

Engineering, supply, erection, testing and commissioning of 33 kv power distribution, traction substation, auxiliary substations and 750 v dc third rail traction system for 4 underground metro stations from mominpur (excl.)-esplanade including tunnels and iim station including viaduct from joka (excl.)-iim section of diamond park-joka-esplanade corridor of metro railway, kolkata (west bengal), india

Read more
Periodical painting of steel girder bridge of br. no.06- east line (rail viaduct composite girder spans 16x31.6m+23x29.776m+5x31.458m+1x31.708m) at km-08/32-10/24 between stations ppta - phlg and ten(10) spans (span no. 01 to 10) of bridge no. 07(2x64+36x119.6m) at km 10/42-15/24 between stations ppta - phlg of danapur division under dy.ce/brl/hjp.

Periodical painting of steel girder bridge of br. no.06- east line (rail viaduct composite girder spans 16x31.6m+23x29.776m+5x31.458m+1x31.708m) at km-08/32-10/24 between stations ppta - phlg and ten(10) spans (span no. 01 to 10) of bridge no. 07(2x64+36x119.6m) at km 10/42-15/24 between stations ppta - phlg of danapur division under dy.ce/brl/hjp.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise