| Particulars | Details |
|---|---|
| Title |
Viaduct Maintenance
|
| Description |
Comprehensive Maintenance Of Viaducts
|
| Organisation | Chennai Metro Rail Limited | Central Govt. Ministry/Department |
| Tender Id | 2024_CMRL_838181_1 |
|
Reference Number |
2024_CMRL_Viaduct Maintenance |
| Tender Fee | 16000 |
| EMD | 4.91 Lakh |
| Tender Value | - |
| Place | Chennai |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=880992 |
| Start Date | December 26, 2024 14:30 |
| End Date |
Expired
02/01/2025
Expired 655 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of viaduct and elevated stations of gurugram metro rail limited
Construction of viaduct and elevated stations from sector 9 metro station (exclusive) to cyber city metro station (inclusive) of gurugram metro corridor between millennium city centre and cyber city, gurugram, india.
Read moreMaintenance contract for controlling leakage and seepage in underground section including tunnel/viaduct, station building, ancillary building, staff qtrs, depot, rss and other associate buildings and maintenance of drainage system of viaduct of...
Maintenance contract for controlling leakage and seepage in underground section including tunnel/viaduct, station building, ancillary building, staff qtrs, depot, rss and other associate buildings and maintenance of drainage system of viaduct of...
Read morePart design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.
Part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.
Read moreOverlay work at approaches to rail cum road bridge across river ganga at munger ghat near munger from km 0.00(km 74.7 of nh-80) to km 9.394(start point of rail cum road viaduct) and km 0.075(end point of rail cum road viaduct) to km 5.198(km 262.8 of
Overlay work at approaches to rail cum road bridge across river ganga at munger ghat near munger from km 0.00(km 74.7 of nh-80) to km 9.394(start point of rail cum road viaduct) and km 0.075(end point of rail cum road viaduct) to km 5.198(km 262.8 of
Read moreManufacturing, supplying and fixing of precast rcc cable trough cover slabs at viaduct track level in reach-1 and reach-2 of line-1
Replacing of damaged cable trough cover slabs and manufacturing, supplying and fixing of precast rcc cable trough cover slabs at viaduct track level
Read morePart design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreDesign and construction of elevated viaduct twin tunnel by shield tbm cut and cover tunnel mid ventilation cum emergency egress shaft crosspassages ramps two underground stations bengali chauraha and palasia chauraha including architectural finishing
Design and construction of elevated viaduct twin tunnel by shield tbm cut and cover tunnel mid ventilation cum emergency egress shaft crosspassages ramps two underground stations bengali chauraha and palasia chauraha including architectural finishing
Read moreDk/dd/cor-of/029 - engagement of detailed design consultant for civil, architectural, and e and m works for the design of elevated viaduct and stations, depots and property development area for delhi-karnal namo bharat corridor.
Dk/dd/cor-of/029 - engagement of detailed design consultant for civil, architectural, and e and m works for the design of elevated viaduct and stations, depots and property development area for delhi-karnal namo bharat corridor.
Read moreEngineering, supply, erection, testing and commissioning of 33 kv power distribution, traction substation, auxiliary substations and 750 v dc third rail traction system for 4 underground metro stations from mominpur (excl.)-esplanade including tunnels and iim station including viaduct from joka (excl.)-iim section of diamond park-joka-esplanade corridor of metro railway, kolkata (west bengal), india
Engineering, supply, erection, testing and commissioning of 33 kv power distribution, traction substation, auxiliary substations and 750 v dc third rail traction system for 4 underground metro stations from mominpur (excl.)-esplanade including tunnels and iim station including viaduct from joka (excl.)-iim section of diamond park-joka-esplanade corridor of metro railway, kolkata (west bengal), india
Read morePeriodical painting of steel girder bridge of br. no.06- east line (rail viaduct composite girder spans 16x31.6m+23x29.776m+5x31.458m+1x31.708m) at km-08/32-10/24 between stations ppta - phlg and ten(10) spans (span no. 01 to 10) of bridge no. 07(2x64+36x119.6m) at km 10/42-15/24 between stations ppta - phlg of danapur division under dy.ce/brl/hjp.
Periodical painting of steel girder bridge of br. no.06- east line (rail viaduct composite girder spans 16x31.6m+23x29.776m+5x31.458m+1x31.708m) at km-08/32-10/24 between stations ppta - phlg and ten(10) spans (span no. 01 to 10) of bridge no. 07(2x64+36x119.6m) at km 10/42-15/24 between stations ppta - phlg of danapur division under dy.ce/brl/hjp.