Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
75/Nit/Ee/Aad/2023 24
|
| Description |
Earth Filling In Low Lying Area At Residential Quarter At Icar Cpcri, Kahikuchi, Guwahati, (Sh: Providing And Fixing Of Kerb Stone At Cpcri Campus Road In Cpcri, Kahikuchi 781017).
|
| Organisation | Central Public Works Department (CPWD) | Central Govt. Ministry/Department |
| Tender Id | 69932 |
|
Reference Number |
75/NIT/EE/AAD/2023-24 |
| Tender Fee | 0 |
| EMD | 17406 |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=6370776424637077642436393933322437352f4e49542f45452f4141442f323032332d3234 |
| Start Date | February 27, 2024 21:07 |
| End Date |
Expired
05/03/2024
Expired 957 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supplying and earth filling in proposed bus stand low lying site area at venkulamkarai in kollencode municipality.
Supplying and earth filling in proposed bus stand low lying site area at venkulamkarai in kollencode municipality.
Read moreWorking estimate for providing medical gas arrangements and filling low lying area in government hospital at kanniyakumari in kanniyakumari district.
Working estimate for providing medical gas arrangements and filling low lying area in government hospital at kanniyakumari in kanniyakumari district.
Read moreCutting of grass, pruning of trees, shrub, bushes upto boundary including clearing the dry grass outside md land and filling of earth in both side of low lying area of runway at shibpur under (s) diglipur
Cutting of grass, pruning of trees, shrub, bushes upto boundary including clearing the dry grass outside md land and filling of earth in both side of low lying area of runway at shibpur under (s) diglipur
Read moreSupplying and filling the low lying area using gravel at available vacant land in the south west side at apca campus in vellore district.
Supplying and filling the low lying area using gravel at available vacant land in the south west side at apca campus in vellore district.
Read moreFilling low lying area and levelling the soil along the sides of building for the work of construction of 150 students mbc college girls hostel building in arignar anna government arts college at lathuvadi in mohanur tk namakkal district
Filling low lying area and levelling the soil along the sides of building for the work of construction of 150 students mbc college girls hostel building in arignar anna government arts college at lathuvadi in mohanur tk namakkal district
Read moreSw-i:-secunderabad division - bpq-kzj sections: widening/repair of cess ,filling up of low lying areas near toe of bank , providing toe bank, & precast / cast insitu rcc central drain & cross drain hdpe pipe through the railway formation at a required depth to the required slope etc. for a total length of 7.93kms. in sse/p.way/magh&mci section under aden/bpa & aden/rdm sub-division. sw-ii:-bpq - kzj section: cutting the slopes to avoid loose earth filling inside drains and bloc
Sw-i:-secunderabad division - bpq-kzj sections: widening/repair of cess ,filling up of low lying areas near toe of bank , providing toe bank, & precast / cast insitu rcc central drain & cross drain hdpe pipe through the railway formation at a required depth to the required slope etc. for a total length of 7.93kms. in sse/p.way/magh&mci section under aden/bpa & aden/rdm sub-division. sw-ii:-bpq - kzj section: cutting the slopes to avoid loose earth filling inside drains and bloc
Read moreGdr-bza section: tftr- widening/ repair of cess, filling up low lying areas near toe of bank to avoid water stagnation, providing central & cross drains to limited length on up & dn line from km.181.200-184.000 in formation of height greater than 3m for a length of 2.800km.
Gdr-bza section: tftr- widening/ repair of cess, filling up low lying areas near toe of bank to avoid water stagnation, providing central & cross drains to limited length on up & dn line from km.181.200-184.000 in formation of height greater than 3m for a length of 2.800km.
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreEarth filling in low lying portion of bsnl compound lalpur varanasi
Earth filling in low lying portion of bsnl compound lalpur varanasi
Read moreof your Industry type