Tender Details

Particulars Details
Title
Mcb 32 A, Sp, 130 V Dc With Extended Connecting Terminal
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 106505637
Reference
Number
54246108
Tender Fee 0
EMD 0
Tender Value -
Place Kolkata
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/supply/pdfdocs/112024/106505637/viewNitPdf_4751259.pdf

Start Date October 22, 2024 23:12
End Date
Expired 12/11/2024

Expired 655 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply & installation of 125kva diesel generator to sp office yadagiri & with buy-back of old 62.5 kv generator

Supply & installation of 125kva diesel generator to sp office yadagiri & with buy-back of old 62.5 kv generator

Read more
Sp/b957-000-xc-mr-0040/174 switchboard-lv-drawout with acb for bina petchem and refinery expansion project (bprep)

Sp/b957-000-xc-mr-0040/174 switchboard-lv-drawout with acb for bina petchem and refinery expansion project (bprep)

Read more
Maintenance of highway connecting firozabad cross (nh-218) with kamalapura state highway connecting via shabad, bankur, peta shirur, mudbala, kudli, rumanagada, chengata from km 83.89 to 102.00 (sh125) in kamalapur taluka under 3054 sh road maintenance for the year 2026-27

Maintenance of highway connecting firozabad cross (nh-218) with kamalapura state highway connecting via shabad, bankur, peta shirur, mudbala, kudli, rumanagada, chengata from km 83.89 to 102.00 (sh125) in kamalapur taluka under 3054 sh road maintenance for the year 2026-27

Read more
Maintenance of highway connecting firozabad cross (nh-218) with kamalapura state highway connecting via shabad, bankur, peta shirur, mudbala, kudli, rumanagada, chengata from km 3.00 to 7.52 sh125 in kalaburagi taluka under 3054 sh road maintenance for the year 2026-27

Maintenance of highway connecting firozabad cross (nh-218) with kamalapura state highway connecting via shabad, bankur, peta shirur, mudbala, kudli, rumanagada, chengata from km 3.00 to 7.52 sh125 in kalaburagi taluka under 3054 sh road maintenance for the year 2026-27

Read more
Maintenance of sh-125 highway connecting firozabad cross (nh218) with kamalapura state highway connecting from ch 76.49 km to 85.29 km & 88.80 km to 93.06 km in kamalpur taluka (chincholi constituency) under 3054 sh road maintenance for the year 2026-27

Maintenance of sh-125 highway connecting firozabad cross (nh218) with kamalapura state highway connecting from ch 76.49 km to 85.29 km & 88.80 km to 93.06 km in kamalpur taluka (chincholi constituency) under 3054 sh road maintenance for the year 2026-27

Read more
Annual maintenance for the year 2025-26 for the state highway connecting mandya with hadagali road (sh-47) from ch 49.20 to 63.20 km in k.r.pete taluk

Annual maintenance for the year 2025-26 for the state highway connecting mandya with hadagali road (sh-47) from ch 49.20 to 63.20 km in k.r.pete taluk

Read more
Highway connecting sindagi with kodangal via sahapur, kanapur, yadagiri and gurmitkal from km 17.66 to 18.81 and 23.61 to 34.82 in jewargi taluka kalaburagi district under sh maintnance for the year 2026-27

Highway connecting sindagi with kodangal via sahapur, kanapur, yadagiri and gurmitkal from km 17.66 to 18.81 and 23.61 to 34.82 in jewargi taluka kalaburagi district under sh maintnance for the year 2026-27

Read more
Maintenance of highway connecting umarga with sulepet via alandh, mahagaon and chincholi from km 61.82 to 73.00 & 76.37 to 80.50 (sh32) in kalaburagi taluka under 3054 sh road maintenance for the year 2026-27

Maintenance of highway connecting umarga with sulepet via alandh, mahagaon and chincholi from km 61.82 to 73.00 & 76.37 to 80.50 (sh32) in kalaburagi taluka under 3054 sh road maintenance for the year 2026-27

Read more
Establishing 2x12.5mva, 66/11kv sub-station at paduvalahippe village along with construction of 66kv lilo line on 110kv dc towers using coyote conductor for a distance of 1.520km

Establishing 2x12.5mva, 66/11kv sub-station at paduvalahippe village along with construction of 66kv lilo line on 110kv dc towers using coyote conductor for a distance of 1.520km from the existing 66kv kadavinakote-hanagarahally-hassan line-1 to proposed padavalahippe substation in holenarasipura taluk, hassan district on partial turnkey basis including supply of all materials/equipments (excluding supply of 2x12.5mva 66/11kv power transformers and 11kv switchgear) and erection (including civil works) of all materials/equipments, testing and commissioning.

Read more
Annual maintenance of highway connecting hunasanahalli with chikkahalli via kanakapura, ramanagara, magadi, solur, sompura, koratagere, madugiri and pavagada road from ch 137.48 km to 146.09 km for the year 2026-27 in tumkur taluk (totalch137.48 km to 146.09 km)

Annual maintenance of highway connecting hunasanahalli with chikkahalli via kanakapura, ramanagara, magadi, solur, sompura, koratagere, madugiri and pavagada road from ch 137.48 km to 146.09 km for the year 2026-27 in tumkur taluk (totalch137.48 km to 146.09 km)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise