Tender Details

About Tender

🚂 Tender Announcement: Unloading And Loading Services For Mg Coaches 🛤️ The Ministry Of Railways, Central Government, Invites Tenders From Experienced Service Providers For The Unloading Of Mg (Mainline) Coaches And Trolleys From Bg (Broad Gauge) Brn (Bundelkhand Railway Nigam) And The Subsequent Loading Of Mg Coaches And Trolleys On Bg Brn At Coaching Depot Mailani For A Period Of One Year (12 Months). 📅 Submission Deadline: July 15, 2024, 3:00 Pm A Tender Security Amount Of Inr 39400 Is Required. Interested Bidders Should Review The Complete Tender Document For Detailed Instructions And Requirements. Keywords: Ministry Of Railways, Unloading, Loading, Mg Coaches, Trolleys, Tender, Central Govt. Ministry/Department, Coaching Depot Mailani, Bundelkhand Railway Nigam, Tender Security
Particulars Details
Title
Unloading Of Mg Coaches And Trolleys From Bg Brn And Loading Of Mg Coaches And Trolleys On Bg Brn At Coaching Depot Mailani For A Period Of 01 Year (12 Months)
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 75799921
Reference
Number
08-2024-CW
Tender Fee 0
EMD 39400
Tender Value -
Place Gorakhpur
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75799921/viewNitPdf_4613126.pdf

Start Date June 20, 2024 21:17
End Date
Expired 15/07/2024

Expired 824 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Mechanized washing of dirty linens of ac coaches, packaging of washed linens and loading and unloading to and from trains of santragachi & padmapukur coaching depot for a period of 02 (two) years.

Mechanized washing of dirty linens of ac coaches, packaging of washed linens and loading and unloading to and from trains of santragachi & padmapukur coaching depot for a period of 02 (two) years.

Read more
Loading-unloading and stacking of railway material for 02 years at 09 depot in general stores depot/kgp under dy.cmm/gsd/kgp

Loading-unloading and stacking of railway material for 02 years at 09 depot in general stores depot/kgp under dy.cmm/gsd/kgp

Read more
Patch work of fleet graphics film for exterior of lhb coaches for gaya coaching depot. qty.1 set

Patch work of fleet graphics film for exterior of lhb coaches for gaya coaching depot. qty.1 set

Read more
Custom bid for services - mechanized washing, carting, loading unloading of linen items, blankets of all ac coaches, blanket covers etc of ist ac coaches, based at cw depot bsb for a period of three years 1096 days

Custom bid for services - mechanized washing, carting, loading unloading of linen items, blankets of all ac coaches, blanket covers etc of ist ac coaches, based at cw depot bsb for a period of three years 1096 days

Read more
Custom bid for services - estimated value for eddy current array testing (eca) of wheel sets of lhb coaches at coaching depot kacheguda

Custom bid for services - estimated value for eddy current array testing (eca) of wheel sets of lhb coaches at coaching depot kacheguda

Read more
Work of standardization of water filling assembly for lhb type ac includingpower car and scn eog coaches as per rcf cai at ltt coaching depot.

Work of standardization of water filling assembly for lhb type ac includingpower car and scn eog coaches as per rcf cai at ltt coaching depot.

Read more
To procure, transport, supply, loading, unloading, installation, commissioning, training, trail run, including civil engineering ,electrification to provide license to be handed over to custodian chief depot superintendent, signal stores depot, podanur

To procure, transport, supply, loading, unloading, installation, commissioning, training, trail run, including civil engineering ,electrification to provide license to be handed over to custodian chief depot superintendent, signal stores depot, podanur

Read more
Modification in feed pipe and air suspension line for connecting 150 l auxiliary reservoir in lhb coaches with material at bdts coaching depot for a period of 06 months.

Modification in feed pipe and air suspension line for connecting 150 l auxiliary reservoir in lhb coaches with material at bdts coaching depot for a period of 06 months.

Read more
Modification in 1st ac lhb coaches by provision of reverse mounting arrangement of sliding door in cabin-8 and relocation of npp-end intercommunication swing door at coaching depot indore and dadn.

Modification in 1st ac lhb coaches by provision of reverse mounting arrangement of sliding door in cabin-8 and relocation of npp-end intercommunication swing door at coaching depot indore and dadn.

Read more
Supply and fitment of f- bracket for clamping of s-trap & installation of ss cage in the commode chute of the bio-toilet in the coaches of primary trains of coaching depot, hatia.

Supply and fitment of f- bracket for clamping of s-trap & installation of ss cage in the commode chute of the bio-toilet in the coaches of primary trains of coaching depot, hatia.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise