Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Hollow 4 Square Section Pillar 16 Feet With Bracing,Hollow 4 Square Section Frame 19 Feet With Brac
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/4657897 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | February 19, 2024 18:25 |
| End Date |
Expired
29/02/2024
Expired 961 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | HINDUSTAN INFRAS CO | - | 29-02-2024 10:27:43 | MSE | Qualified |
| 2 | SHREE ASHTAVINAYAK ENTERPRISES | - | 29-02-2024 09:55:24 | MSE | Qualified |
| 3 | SUNSHINE ENTERPRISES | - | 27-02-2024 15:44:12 | MSE | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | SUNSHINE ENTERPRISES(MSE)( MSE Social Category:General ) | Item Categories : Hollow 4 Square Section Pillar 16 Feet With Bracing,Hollow 4 Square Section Frame 19 Feet With Brac | 145500.00 | L1 |
| 2 | HINDUSTAN INFRAS CO (MSE)( MSE Social Category:General ) | Item Categories : Hollow 4 Square Section Pillar 16 Feet With Bracing,Hollow 4 Square Section Frame 19 Feet With Brac | 150520.00 | L2 |
| 3 | SHREE ASHTAVINAYAK ENTERPRISES (MSE)( MSE Social Category:General ) | Item Categories : Hollow 4 Square Section Pillar 16 Feet With Bracing,Hollow 4 Square Section Frame 19 Feet With Brac | 154001.00 | L3 |
Galvanised square hollow section,galvanised square hollow,galvanised square section,galvanised hollow,galvanised square hollow pipe,corrugated color sheet,kiker handle,kiker handles
Galvanised square hollow section,galvanised square hollow,galvanised square section,galvanised hollow,galvanised square hollow pipe,corrugated color sheet,kiker handle,kiker handles
Read moreFlex board with frame 13 x 8 feet,flex board with frame 8 x 4.5 feet,flex board with frame 16 x 10 feet,flex board with frame 10 x 8 feet
Flex board with frame 13 x 8 feet,flex board with frame 8 x 4.5 feet,flex board with frame 16 x 10 feet,flex board with frame 10 x 8 feet
Read moreSingle sided grocery racks of size 6 feet x 3 feet,extra pillar of minimum 16 gauge to strengthen the racks
Single sided grocery racks of size 6 feet x 3 feet,extra pillar of minimum 16 gauge to strengthen the racks
Read moreFlex board with frame 8 x 6 feet,flex board with frame 7 x 5 feet,flex board with frame 5 x 5 feett,flex board with frame 8 x 5 feet
Flex board with frame 8 x 6 feet,flex board with frame 7 x 5 feet,flex board with frame 5 x 5 feett,flex board with frame 8 x 5 feet
Read moreSbd 19 dt. 16-10-25 gate53
River erosion mitigation measure by repairing and extending reclamation spur no 2 opposite border fencing near gate no 53 bop dharamparkash on left side of river ravi
Read moreMountain with water system,pleatue,pond,planets 8 in n0,2 pillar rounded,2 earth on pillar,4 pillar,5 square plate cementd on pillars,middle pillar,book on pillar,6 iron pillar with hut,cemented and painted 3d map of india on cemented foundation,wall paint,labeling and maintaince of area,iron gate,volcano
Mountain with water system,pleatue,pond,planets 8 in n0,2 pillar rounded,2 earth on pillar,4 pillar,5 square plate cementd on pillars,middle pillar,book on pillar,6 iron pillar with hut,cemented and painted 3d map of india on cemented foundation,wall paint,labeling and maintaince of area,iron gate,volcano
Read moreSbd 19 dt. 16-10-25 rd 12000
River erosion mitigation measure by repair ,restoration and bringing to design section revetment and studs on u/s of spur rd 12000 at advance bundh for the safety of c-land,advance bundh and village abadies on left side of river ravi.
Read moreSbd 19 dt. 16-12-25 rd 88200
River erosion mitigation by repair of spur apron along with stud and shank portion at rd 88200 of main fpe on left side of river ravi
Read moreSbd 19 dt. 16-10-25 rd 2000
River erosion mitigation measure by repair ,restoration and bringing to design section spur at rd 2000 along with repair and restoration of revetment and t-studs on u/s of spur rd 2000 in chaharpur complex.
Read moreof your Industry type