Tender Details
Particulars | Details |
---|---|
Title |
Water Supply Work Through Pipe Line Supply From Tank Near House Of Hossain At Dakshin Harishpur Fultala.
|
Description |
Water Supply Work Through Pipe Line Supply From Tank Near House Of Hossain At Dakshin Harishpur Fultala.
|
Organisation | Zilla Parishad | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 500 |
EMD | 6669 |
Tender Value | |
Place | Dakshin Harishpur Fultala. |
Link |
AAAAAAAAAA Login to view |
Start Date | May 28, 2025 22:00 |
End Date |
09/06/2025 ( 2 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreSpecial repair to bldg no. t-61 (supply pm) provn of repair shed with hardstanding near bldg no. p-04 and provn of drainage at nlp mil stn under ge 872 ews
Special repair to bldg no. t-61 (supply pm) provn of repair shed with hardstanding near bldg no. p-04 and provn of drainage at nlp mil stn under ge 872 ews
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreSupply installation commissioning and maintaining 02 units of fully automatic biochemistry analyzers on reagent rental basis for dept of biochemistry at aiims bhubaneswar for a period of five years from letter of award
Supply installation commissioning and maintaining 02 units of fully automatic biochemistry analyzers on reagent rental basis for dept of biochemistry at aiims bhubaneswar for a period of five years from letter of award
Read moreW.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
Read moreConstruction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)
Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)
Read moreDeployment of 01 no. brand new utility vehicle (bolero camper gold zx ) at 400 kv rajarhat gis substation for transmission line maintenance work for a period of 03 years
Deployment of 01 no. brand new utility vehicle (bolero camper gold zx ) at 400 kv rajarhat gis substation for transmission line maintenance work for a period of 03 years
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreRepair / replacement and improvement of existing water supply distribution system, replacement of old ci / di pipeline and other connected items at nad pump house, navy nagar area, nofra area at naval station karanja
Repair / replacement and improvement of existing water supply distribution system, replacement of old ci / di pipeline and other connected items at nad pump house, navy nagar area, nofra area at naval station karanja
Read moreof your Industry type