Tender Details

Particulars Details
Title
Construction Of Line Under Deposit Scheme Edd Ii,Mirzapur
Description
Construction Of Line Under Deposit Scheme Edd Ii,Mirzapur
Organisation Government of Uttar Pradesh
Tender Id 2023_PVVNV_853536_1
Reference
Number
65/EDC(M)/23-24
Tender Fee 1180
EMD 10000
Tender Value
Place SUPERINTENDING ENGINEER EDC Mirzapur
Link
View Original Tender Notice

https://etender.up.nic.in

Start Date October 19, 2023 18:30
End Date
Expired 28/11/2023

Expired 966 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Certain repair to map accn under age b/r-ii at amritsar cantt

Certain repair to map accn under age b/r-ii at amritsar cantt

Read more
Work regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.

Work regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.

Read more
Revamp of bpi-i phase-ii works at awantipur asf

Revamp of bpi-i phase-ii works at awantipur asf

Read more
Upgradation of power line at ind. area boranada ph-iv and epipi

Upgradation of power line at ind. area boranada ph-iv and epipi

Read more
Construction of two wheeler parking behind post office haridwar under kumbh mela 2027.

Construction of two wheeler parking behind post office haridwar under kumbh mela 2027.

Read more
Augmentation of dry fly ash transportation system at barauni thermal power station, stage-ii (2x250 mw)

Augmentation of dry fly ash&#x0d transportation system&#x0d at&#x0d barauni thermal power station, stage-ii&#x0d (2x250 mw)

Read more
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2

Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&amp#x0d

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Construction of drainage at mgr nagar in narasingarayanpettai

Construction of drainage at mgr nagar in narasingarayanpettai

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise