Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Line Under Deposit Scheme Edd Ii,Mirzapur
|
| Description |
Construction Of Line Under Deposit Scheme Edd Ii,Mirzapur
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_PVVNV_853536_1 |
|
Reference Number |
65/EDC(M)/23-24 |
| Tender Fee | 1180 |
| EMD | 10000 |
| Tender Value | |
| Place | SUPERINTENDING ENGINEER EDC Mirzapur |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | October 19, 2023 18:30 |
| End Date |
Expired
28/11/2023
Expired 966 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Certain repair to map accn under age b/r-ii at amritsar cantt
Certain repair to map accn under age b/r-ii at amritsar cantt
Read moreWork regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.
Work regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.
Read moreRevamp of bpi-i phase-ii works at awantipur asf
Revamp of bpi-i phase-ii works at awantipur asf
Read moreUpgradation of power line at ind. area boranada ph-iv and epipi
Upgradation of power line at ind. area boranada ph-iv and epipi
Read moreConstruction of two wheeler parking behind post office haridwar under kumbh mela 2027.
Construction of two wheeler parking behind post office haridwar under kumbh mela 2027.
Read moreAugmentation of dry fly ash transportation system at barauni thermal power station, stage-ii (2x250 mw)
Augmentation of dry fly ash
 transportation system
 at
 barauni thermal power station, stage-ii
 (2x250 mw)
Read moreUnder district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction of drainage at mgr nagar in narasingarayanpettai
Construction of drainage at mgr nagar in narasingarayanpettai
Read moreof your Industry type