Tender Details
Particulars | Details |
---|---|
Title |
Track Bolt 1,Track Shoe,Dowel Pin,Nut,Track Bolt 2
|
Description |
|
Organisation | EASTERN COALFIELDS Limited | Ministry of Coal |
Tender Id | GEM/2023/B/3855210 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://gem.gov.in/ |
Start Date | August 24, 2023 20:47 |
End Date |
11/09/2023 ( Expired 627 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
---|---|---|---|---|---|
1 | B.B.M ENGINEERING CO | - | 10-09-2023 15:32:39 | MII MSE | Qualified |
2 | S.B.S ENTERPRISE | - | 10-09-2023 14:20:23 | MII MSE | Qualified |
3 | SOUNOK ENTERPRISE | - | 10-09-2023 15:42:11 | MII MSE | Disqualified |
S.No. | Seller Name | Offered Item | Total Price | Rank |
---|---|---|---|---|
1 | S.B.S ENTERPRISE(MSE,MII)( MSE Social Category:General ) | Item Categories : Track Bolt - 1,Track Shoe,Dowel Pin,Nut,Track Bolt - 2 | 169706.96 | L1 |
2 | B.B.M ENGINEERING CO (MSE,MII)( MSE Social Category:General ) | Item Categories : Track Bolt - 1,Track Shoe,Dowel Pin,Nut,Track Bolt - 2 | 241003.20 | L2 |
Contract Details
- Contract Status:
- Order Accepted
- Seller:
- S.B.S ENTERPRISE
- Buyer Designation:
- AM MM
- Buying Mode:
- Bid/RA
- Contract Date:
- 2023-10-14 18:41:00 +0530
- Contract Amount:
- 169706.96
Product | Brand | Model | Ordered Quantity | Price |
---|---|---|---|---|
Track Bolt - 1 | NA | BOQ Item | 112 | ₹ 7929.600 |
Track Shoe | NA | BOQ Item | 28 | ₹ 145096.000 |
Dowel Pin | NA | BOQ Item | 100 | ₹ 3770.000 |
Nut | NA | BOQ Item | 224 | ₹ 4757.760 |
Track Bolt - 2 | NA | BOQ Item | 112 | ₹ 8153.600 |
Prototype 1,prototype 2,prototype 3,prototype 4,prototype 5,bulk 1,bulk 2,bulk 3,bulk 4,bulk 5
Read more
New connectivity of road from 1. l424-coloni-1 to boro kangrai, l- 2.637 km , package- tr0315-p4 , block- dasda. 2. l422-shaliram para and aniram para, l- 2.662 km, package- tr0322-p4 , block- dasda. 3. l426-sailaram and daranimohan para, l- 1.205 k
Pm-janman works
Read moreHiring services 1 number brand new tata 407 gold sfc dcr33hsd 2wd bs6 2 at plm department ps5 noonmati for a period of four years
Hiring services 1 number brand new tata 407 gold sfc dcr33hsd 2wd bs6 2 at plm department ps5 noonmati for a period of four years
Read more(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
Read moreRenovation of sanitary items electrical wiring and other miscellaneous civil works of washrooms at power house no 1 2 and 3 of ubdc project malikpur pathankot
Renovation of sanitary items electrical wiring and other miscellaneous civil works of washrooms at power house no 1 2 and 3 of ubdc project malikpur pathankot
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read more1 -ln9130-5.1416. 0 / mil-p-25690 /gs249 thick 1.5 mm size= 1600 x 2200mm. acrylic glass-sheet,2 -
Read more
As per attached eoi documents 1,as per attached eoi documents 2,as per attached eoi documents 3,as
Read more
Biennial maintenance of ash slurry line extension at different dp and dp changeover (both phase -1 and phase -2) inside ash pond of sgtpp
Biennial maintenance of ash slurry line extension at different dp and dp changeover (both phase -1 and phase -2) inside ash pond of sgtpp
Read moreof your Industry type