Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Hot Or Cold Water Dispenser,Non Carbonated Beverage Dispenser,Non Carbonated Beverage Dispenser
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2023/B/3815952 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | August 12, 2023 14:30 |
| End Date |
Expired
21/08/2023
Expired 1148 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Tender for supply of machineries for production of emulsion paints and modification of pu putty dispenser
Tender for supply of machineries for production of emulsion paints and modification of pu putty dispenser
Read moreSupply of control damper assembly for mill hot primary air of unit-xi boiler
Supply of control damper assembly for mill hot primary air of unit-xi boiler
Read moreEstimate for construction of p.c.c road and r.c.c drain form cold stroge to ravidas mandir in ward no. 15
Estimate for construction of p.c.c road and r.c.c drain form cold stroge to ravidas mandir in ward no. 15
Read moreProcurement of electrical spares for high pressure hot water/steam jet washing/cleaning machine working at shovel section, ocp3, rg2.
Procurement of electrical spares for high pressure hot water/steam jet washing/cleaning machine working at shovel section, ocp3, rg2.
Read moreOutsourcing of rubber lagging, cold vulcanizing joint and patch works for belts working at jvr chp, sathupally area for a period of 2 years
Outsourcing of rubber lagging, cold vulcanizing joint and patch works for belts working at jvr chp, sathupally area for a period of 2 years
Read moreConstruction of hot dipped galvanized iron chain link mesh or compound wall of r and b circuit guest house in mahabubnagar district.
Construction of hot dipped galvanized iron chain link mesh or compound wall of r and b circuit guest house in mahabubnagar district.
Read moreShort e-tender empanelment / rate contract - supply, testing, installation, commissioning and 5-year comprehensive maintenance of decentralized solar cold storage systems (<100 mt) in bihar
Short e-tender empanelment / rate contract - supply, testing, installation, commissioning and 5-year comprehensive maintenance of decentralized solar cold storage systems (<100 mt) in bihar
Read moreProcurement of refrigerant non cfcri 34a air conditioner for use at srpocp srp area-reg.
Procurement of refrigerant non cfcri 34a air conditioner for use at srpocp srp area-reg.
Read moreComprehensive operation and maintenance and special repair of 110 nos ward level piped water supply schemes (non quality) & 16 nos pws scheme based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bill for five years. no. of schemes: wls(non quality): 110 pws(non quality): 16 p h division jhanjharpur
Comprehensive operation and maintenance and special repair of 110 nos ward level piped water supply schemes (non quality) & 16 nos pws scheme based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bill for five years. no. of schemes: wls(non quality): 110 pws(non quality): 16 p h division jhanjharpur
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreof your Industry type