Tender Details
Particulars | Details |
---|---|
Title |
Providing Deep Borewell And Construction Of Mini Oht At Muppittathi Amman Koil Back Side Thiruvalluvar
|
Description |
Providing Deep Borewell And Construction Of Mini Oht At Muppittathi Amman Koil Back Side Thiruvalluvar&Amp#X0d
Street In Ward No15
|
Organisation | MAWS | State Govt. and UT |
Tender Id | 2024_MAWS_421988_1 |
Reference Number |
53/2023-24/18 |
Tender Fee | 0 |
EMD | 2500 |
Tender Value | |
Place | S.N.High road Main office Tirunelveli Corproration |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=501636 |
Start Date | February 09, 2024 22:00 |
End Date |
15/02/2024 ( Expired 465 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreConstruction of mini secretariat at dakopgre, tura, meghalaya on design, engineering, procurement and construction (epc) basis
Construction of mini secretariat at dakopgre, tura, meghalaya on design, engineering, procurement and construction (epc) basis
Read moreRemodeling of lift irrigation scheme patta brawary in gp brawary tehsil and distt solan sh construction of percolation well providing laying jointing testing and commissioning of rising main of gi pipe medium grade 150 mm dia conforming to bis 1239
Remodeling of lift irrigation scheme patta brawary in gp brawary tehsil and distt solan sh construction of percolation well providing laying jointing testing and commissioning of rising main of gi pipe medium grade 150 mm dia conforming to bis 1239
Read moreSelection of back-end partner for implementation of a turnkey project for providing voice and data network over ofc with futuristic plan for integrati
Selection of back-end partner for implementation of a turnkey project for providing voice and data network over ofc with futuristic plan for integration of surveillance equipments on 08 nos ib deployed units under ftr hq jammu
Read moreProviding project management consultancy for construction of new air conditioned engine assembly shop with annex building for offices and sub-station at engine factory avadi
Providing project management consultancy for construction of new air conditioned engine assembly shop with annex building for offices and sub-station at engine factory avadi
Read moreCapital grand fund 2024-2025 construction of retaining wall at main road channel south side kaliyamman koil street to arisikadai bus stand in devadanapatti town panchayat
Construction of retaining wall at main road channel south side kaliyamman koil street to arisikadai bus stand in devadanapatti town panchayat
Read moreDesign, construction, supply, testing, commissioning of water treatment system with back wash water recycling system for improvement of the quality of water supplied to residential zone at haldia township under hdc including operation and maintenance
Design, construction, supply, testing, commissioning of water treatment system with back wash water recycling system for improvement of the quality of water supplied to residential zone at haldia township under hdc including operation and maintenance
Read moreE-tender for optical fiber cable laying and construction works under bop-bip project and replacement of mini link for less than 2km under 4g project in darbhanga ba
E-tender for optical fiber cable laying and construction works under bop-bip project and replacement of mini link for less than 2km under 4g project in darbhanga ba
Read moreConstruction of rcc drain on one side of main road and laying of interlocking tiles on both side of main road at ankur vihar, loni, ghaziabad.
Construction of rcc drain on one side of main road and laying of interlocking tiles on both side of main road at ankur vihar, loni, ghaziabad. &#x0d &#x0d
Read moreConstruction of engineering hall-1 (back-end facility for lwr - llwmp)
Construction of engineering hall-1 (back-end facility for lwr - llwmp) and other miscellaneous works at barc, visakhapatnam, a.p.
Read moreof your Industry type