Tender Details

Particulars Details
Title
Protection Work Of Prion Of Soil Erosion From Amyo Mondal House To Kablijhora Rivere
Description
Protection Work Of Prion Of Soil Erosion From Amyo Mondal House To Kablijhora Rivere
Organisation Zilla Parishad | State Govt. and UT
Tender Id 2024_ZPHD_646635_1
Reference
Number
1048/SGP/E-Tender/2024
Tender Fee 1000
EMD 4100
Tender Value -
Place Satali
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1393157

Start Date January 15, 2024 23:40
End Date
Expired 01/02/2024

Expired 983 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Multi purpose protection system (small)

Multi purpose protection system (small)

Read more
Multi purpose protection system special (mppss)

Multi purpose protection system special (mppss)

Read more
Multi purpose protection system (ug bunker) supply and installation

Multi purpose protection system (ug bunker) supply and installation

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Comprehensive operation and maintenance of 750 kld camus soil bio-technology (sbt) based sewage treatment plant (stp) at mgm hospital, in greater warangal municipal corporation

Comprehensive operation and maintenance of 750 kld camus soil bio-technology (sbt) based sewage treatment plant (stp) at mgm hospital, in greater warangal municipal corporation

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
2nd call-protection wall for breached irrigation channel l/s banking from anicut across korutla vagu at ippapalli (v) jagtial dist.

2nd call-protection wall for breached irrigation channel l/s banking from anicut across korutla vagu at ippapalli (v) jagtial dist.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
O and m extension of flood banks and construction of protection walls to stream joining check dam across pedda vagu, kanmanur(v), addakal (m), mahabubnagar district

O and m extension of flood banks and construction of protection walls to stream joining check dam across pedda vagu, kanmanur(v), addakal (m), mahabubnagar district

Read more
Construction of guest house /inspection bungalow (ib) (g+2) at 132/33 kv gss naugachia, bhagalpur including construction of road, boundary wall, soil filling in premises of ib, supply of furniture, electrical works including ac provisions and other miscellaneous works.

Construction of guest house /inspection bungalow (ib) (g+2) at 132/33 kv gss naugachia, bhagalpur including construction of road, boundary wall, soil filling in premises of ib, supply of furniture, electrical works including ac provisions and other miscellaneous works.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise