Thermal Insulation Of Steam Lines Feed Water Lines Lp Hs Hp Hs Valves Nr Vs During Capital Overhauling Of Turbine Of Unit No 6 2x250 Mw Ptpp Parichha
|
Description |
Thermal Insulation Of Steam Lines Feed Water Lines Lp Hs Hp Hs Valves Nr Vs During Capital Overhauling Of Turbine Of Unit No 6 2x250 Mw Ptpp Parichha
|
Organisation | UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 590 |
EMD | 7000 |
Tender Value | |
Place | PARICHHA |
Link |
AAAAAAAAAA Login to view |
Start Date | April 10, 2025 15:30 |
End Date |
01/05/2025 ( 11 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing assistance for eot crane hoist and light during oh unit no 6
Providing prive and breakdown maintenance support for eot crane , hoists installed in different areas of 2x250 mw and providing assistance for additional power supply support to all working division of ctps parichha during overhauling of unit no
Read moreOverhauling of various capacities lt motors and switchgear of unit #6
Overhauling of various capacities lt motors ranging from &#x0d fractional kw to 170 kw of 0.4 kv/220 v dc and 0.4 kv lt &#x0d switchgears of unit 6 bop during proposed overhauling of unit &#x0d no. 6 in 2x250 mw, ptpp parichha jhansi
Read moreCapital overhauling of 60 mw steam turbo generator # 6
Capital overhauling of 60 mw steam turbo generator # 6
Read moreOverhauling of procon make annunciation system along with contacts cleaning, tightening of terminals and reconditioning of yokogawa dcs panels during oh of unit 6 of 2x250mw, ctps, parichha, jhansi
Overhauling of procon make annunciation system along with contacts cleaning, tightening of terminals and reconditioning of yokogawa dcs panels during oh of unit 6 of 2x250mw, ctps, parichha, jhansi
Read moreOverhauling of power transformers during unt 6 overhauling
Overhauling works of generating transformer, unit &#x0d aux. transformer station &#x0d transformer of unit 6, 2x250 mw ptpp, parichha, jhansi
Read morePainting of actuators at site and panels in dcs room ups, repairing of lock of panels in dcs room etc. and overhauling and servicing of drain/ isolating valve, manifold, impulse lines in oh unit no. 6, 2x250 mw, ptpp, parichha
Painting of actuators at site and panels in dcs room ups, repairing of lock of panels in dcs room etc. and overhauling and servicing of drain/ isolating valve, manifold, impulse lines in oh unit no. 6, 2x250 mw, ptpp, parichha
Read moreOver hauling of electrical system of esp during overhauling of unit no. 6
Over hauling of electrical system of esp and various &#x0d miscellaneous works of esp during overhauling of unit no. 6, &#x0d 2x250 mw,ctps, ptpp parichha (jhansi)
Read moreThermal insulation of steam lines feed water lines lphs hphs valves nrvs during capital overhauling of turbine of unit no 6 2x250 mw ptpp parichha
Thermal insulation of steam lines feed water lines lphs hphs valves nrvs during capital overhauling of turbine of unit no 6 2x250 mw ptpp parichha
Read moreEmandmrt- inspection of hydrogen sealing assembly system (seal and seal rings) inner oil catchers generator and exciter bearings no 5, 6 and 7 and hydrogen and exciter coolers of 250 mw unit 9 of ktps-v stage during annual overhaul period 2025-26.
Emandmrt- inspection of hydrogen sealing assembly system (seal and seal rings) inner oil catchers generator and exciter bearings no 5, 6 and 7 and hydrogen and exciter coolers of 250 mw unit 9 of ktps-v stage during annual overhaul period 2025-26.
Read moreRepairing and strengthening of ep funnel assembly and hard facing of their splitters during capital overhauling of unit6 of 2x250mw, ptpp, parichha, jhansi
Repairing and strengthening of ep funnel assembly and &#x0d hard facing of their splitters during capital overhauling of &#x0d unit6 of 2x250mw, ptpp, parichha, jhansi